My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00941
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00941
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:55:54 PM
Creation date
10/4/2006 6:46:52 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/23/1966
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />MR. STAPLETON: <br /> <br />MR. SLIZESKI: <br /> <br />'-IU-:;I.J <br /> <br />of Engineers in August. In July representatives <br />cf the Chief cf Engineers' cffice were cut fer <br />a field review cf the site and in Octcber the <br />Beard cf Consultants will review the design cf <br />the project. <br /> <br />On the Bear Creek, Mcunt Carbcn Prcject, <br />the interim report which we are preparing on <br />that is in the final stages of completion. <br />We anticipate that the repcrt will be published <br />and reviewed in time to permit consideraticn by <br />the next Ccngress. <br /> <br />On other South Platte River Basin flcod <br />ccntrcl investigaticns we have been ccncentrat- <br />ing primarily en plum Creek, Sand and Toll <br />Gate Creek, and Bijcu Creek basins. In each <br />of these there are scme complexities that have <br />tc be resclved befcre we can ccme up with defin- <br />ite conclusions as tc whether cr not we have <br />eccncmically justifiable projects. Recently <br />we ccmpleted a reccnnaissance investigation in <br />the Pawnee Creek basin in response to a request <br />initiated by the Sterling Chamber cf Ccmmerce. <br />On the basis cf the reconnaissance investiga- <br />ticn, the pcssibility cf flccd ccntrcl in the <br />Pawnee Creek basin dces not lock toe premising <br />at this time. <br /> <br />Our Flccd Plain Informaticn Studies, Metro- <br />pclitan Denver, are prcceeding with studies cf <br />streams scheduled tc be published in vclume IV <br />cf the series in the seven-part series. Present- <br />ly there are delays being experienced in getting <br />funding fer the stream surveys befcre the analy- <br />ses can be made. <br /> <br />That's the substance cf cur repcrt at this <br />time. II <br /> <br />"Have ycu ccmpleted a repcrt, such as the <br />Albuquerque District did, for the South platte <br />Basin?1I <br /> <br />"We are in the precess cf ccmpleting it. We <br />
The URL can be used to link to this page
Your browser does not support the video tag.