Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />MR. STAPLETON: <br /> <br />MR. SLIZESKI: <br /> <br />'-IU-:;I.J <br /> <br />of Engineers in August. In July representatives <br />cf the Chief cf Engineers' cffice were cut fer <br />a field review cf the site and in Octcber the <br />Beard cf Consultants will review the design cf <br />the project. <br /> <br />On the Bear Creek, Mcunt Carbcn Prcject, <br />the interim report which we are preparing on <br />that is in the final stages of completion. <br />We anticipate that the repcrt will be published <br />and reviewed in time to permit consideraticn by <br />the next Ccngress. <br /> <br />On other South Platte River Basin flcod <br />ccntrcl investigaticns we have been ccncentrat- <br />ing primarily en plum Creek, Sand and Toll <br />Gate Creek, and Bijcu Creek basins. In each <br />of these there are scme complexities that have <br />tc be resclved befcre we can ccme up with defin- <br />ite conclusions as tc whether cr not we have <br />eccncmically justifiable projects. Recently <br />we ccmpleted a reccnnaissance investigation in <br />the Pawnee Creek basin in response to a request <br />initiated by the Sterling Chamber cf Ccmmerce. <br />On the basis cf the reconnaissance investiga- <br />ticn, the pcssibility cf flccd ccntrcl in the <br />Pawnee Creek basin dces not lock toe premising <br />at this time. <br /> <br />Our Flccd Plain Informaticn Studies, Metro- <br />pclitan Denver, are prcceeding with studies cf <br />streams scheduled tc be published in vclume IV <br />cf the series in the seven-part series. Present- <br />ly there are delays being experienced in getting <br />funding fer the stream surveys befcre the analy- <br />ses can be made. <br /> <br />That's the substance cf cur repcrt at this <br />time. II <br /> <br />"Have ycu ccmpleted a repcrt, such as the <br />Albuquerque District did, for the South platte <br />Basin?1I <br /> <br />"We are in the precess cf ccmpleting it. We <br />