Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />~~~~ <br /> <br />Since our report to the Beard en 23 June 1966, emergency <br />bank prctecticn work has been ccmpleted en purgatcire River at the <br />Linden Avenue bridge in Trinidad, and repairs have been made tc <br />damaged levees en the Arkansas River in the vicinity cf Beene. This <br />completes the emergency wcrk requested by lccal interests in the <br />Arkansas River Basin in Cclorado. <br /> <br />Representatives cf the Albuquerque District inventcried <br />the flccd damages in Fremcnt and Custer ccunties, Cclcradc, caused <br />by flccds en Grape Creek, Bernard Creek, and Arkansas River during <br />the pericd 1-5 August 1966. Tctal damages resulting frcm the <br />storms are estimated to exceed $460,000 in Custer and Fremont Counties, <br />of which about $117,000 cccurred in the urban area cf Cotcpaxi, <br />Colcradc. Valuable information was also cbtained on rainfall, peak <br />discharges, and the need fer flcod control imprcvements from the <br />reccnnaissance and interviews with lccal interests, city, ccunty, <br />state. and federal cfficials in the area. Data ccllected will be <br />utilized tc assist in determining the feasibility and eccncmic justi- <br />ficaticn cf pctential projects being considered in ccnnection with <br />the current study cf water rescurces develcpment by the Albuquerque <br />District in Arkansas River subbasin abcve Jchn Martin Dam. <br /> <br />significant progress has been made in recent mcnths by <br />the Purgatcire River Water Ccnservancy District and the Bureau cf <br />Reclamation tcward ccnsummaticn cf an irrigaticn repayment contract <br />for the Trinidad Reservoir project. Details regarding this progress <br />will nc dcubt be reported by the Bureau cf Reclamaticn. It now <br />appears that the irrigation repayment ccntract may be executed by <br />1 January 1967. Based on this assumpticn, the Albuquerque District <br />has scheduled resumption of planning and land acquisition en 1 <br />January 1967 and expects tc be able to award a ccntract for ccn- <br />structicn cf the cutlet wcrks by March 1967. <br /> <br />The investigaticns and studies fer flcod contrcl and re- <br />lated purposes in the Arkansas River Basin in Coloradc have been <br />advanced generally in acccrdance with schedules. Numercus prcjects <br />of various types are under ccnsideration for flccd ccntrcl. The <br />feasibility of pcssible prcjects is being tested at this time and <br />ccordinaticn cf plans with ether agencies has been initiated. AS <br />socn as practicable, arrangements will be made to present the pre- <br />liminary findings to local interests, state, and ether federal agen- <br />cies. Fer informaticn, there are inclcsed copies cf a recent report <br />tc the Arkansas-White-Red Basins Inter-Agency Ccmmittee by the Albu- <br />querque District concerning the status of preauthorization planning <br />by the Ccrps cf Engineers in the Arkansas River Basin in Cclcradc and <br />Kansas abcve Great Bend. <br />