Laserfiche WebLink
<br />""~IV <br /> <br />Canycn-Flagstaff-Pinnacle Peak 345-kv line, was <br />energized in July. The Curecanti-poncha sec- <br />ticn of the Curecanti-Midway 230-kv line is <br />ccmpleted, and satisfactory progress is being <br />made en the Pcncha-Midway section. Sc pcwer <br />is being delivered to the Fcur Ccrners, in the <br />figurative sense, frcm the Storage prcject. <br /> <br />The pOWer marketing picture continues to <br />show imprcvement. since the last repcrt, firm <br />power placed under ccntract mcved up to 960,000 <br />kilowatts fer the summer seascn and 710,000 fer <br />the winter, ccmpared with previcus figures of <br />850,000 and 625,000, respectively. pcwer reve- <br />nues have increased steadily and shewed a <br />cumulative total of $16,363,577 en August 1, <br />1966, ccmpared tc a little over $13 million in <br />June. The sales of surplus energy were discon- <br />tinued during the mcnth cf August and will not <br />be resumed until next spring. Increased sales <br />of firm power plus the energy required for <br />Hoover deficiencies, coupled with the seasonal <br />drop in Hoover releases, permit the meeting of <br />downstream needs without the need tc rescrt <br />to surplus energy sales at Glen Canycn for <br />several mcnths. The revenue tc the Stcrage <br />project is accumulating at a rate cf a little <br />over $1 mil lien per mcnth sc the little flags <br />in the till are beginning to shew up with the <br />regularity that we have been lccking forward <br />to. And I might make the general observaticn <br />that the Stcrage Project revenue picture is on <br />a schedule which will, during the buildup phase, <br />allcw meeting the financial obligaticns of the <br />prcject sc we are net disappcinted in any way <br />with respect to revenUe in the Stcrage project. <br /> <br />As far as the water supply and cperating <br />forecast in the Colorado River basin is con- <br />cerned, there has been little change since cur <br />last repcrt on June 27 and can be summarized <br />briefly as fcllcws: <br /> <br />Actual sncwmelt runoff at Lees Ferry for <br />the April-July period tctaled 4.6 millicn acre- <br /> <br />I <br /> <br />I <br />