My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00941
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00941
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:55:54 PM
Creation date
10/4/2006 6:46:52 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/23/1966
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,~....,.uo <br /> <br />dedicaticn cf Glen Canycn Dam which tcck place <br />yesterday beginning at 11 A. M. It was a very <br />colorful and very moving and very gracicus <br />ceremony. The weather was bright and hct; there <br />were prcbably 3000 pecple there; the Navajc <br />Indian people had taken special pains to make <br />her welccme and tc add a great deal cf variety <br />and cclcr tc the scene. So I repcrt to ycu <br />that Glen Canycn Dam is now officially dedi- <br />cated, having been dcne sc in a very fine and <br />appropriate manner. <br /> <br />Regicn 4, and the Bureau cf Reclamaticn as <br />a whcle cf ccurse, wcrk mcst clcsely with this <br />Board, lccking tc them fer ccnsiderable guid- <br />ance in our mutual efforts tc aid the rescurce <br />develcpment program in the Cclcradc River Basin, <br />so when ycuccme tc Regicn 4 it has considerable <br />significance fer us and if there is any way <br />that l1r. Tyner cr myself can aid your visit and <br />give ycu the projects that are here, both ex- <br />isting and pending, we are mcst anxious to do <br />so. <br /> <br />I have filed with you a ccmplete report <br />cf Regicn 4 activities which, with ycur per- <br />missicn, I will just highlight. <br /> <br />All prime ccntract wcrk en Blue Mesa Dam <br />cf the Curecanti Unit is new ccmpleted. The <br />dam contains 3,000,000 cubic y~rds of earth- <br />fill material. The ccmpleticn contractcr, with <br />a little over one-third of the work finished, <br />is mcving ahead with installaticn cf pcwerplant <br />and switchyard structures. The first cf two <br />generatcrs, each with a capacity cf 30,000 <br />kilowatts, is scheduled to gc intc operation <br />this next spring. That will be the first power <br />generaticn for the Curecanti unit. <br /> <br />Morrcw pcint Dam and Pcwerplant are abcut <br />65 percent ccmpleted. Concrete placements are <br />ccntinuing in the dam prcper and in the under- <br />ground pcwerplant. Almcst 47,000 cubic yards <br />of ccncrete were placed in the block sections <br /> <br />I <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.