<br />6077 <br /> <br />I <br /> <br />The contractor for construction of the <br />Divide, South Fork, and Chapman Tunnels, and <br />appurtenant structures of the South Side <br />Collection System has completed 87.1 percent <br />of the contract with 90.1 percent of the <br />contract time elapsed. Lining of the Chap- <br />man tunnel is essentially complete, and the <br />South Fork tunnel lacks only the paved invert. <br />OUtside work, consisting mainly of diversion <br />structures, in the Chapman, South Fork, and <br />Fryingpan valleys is progressing satisfac- <br />torily. In the Divide Tunnel, the contractor <br />has drilled through the concrete plug, and <br />has excavated into the grouted area approxi- <br />mately 8 feet beyond the old heading. <br />Groutable rock bolts and steel supports are <br />being installed in this section. To provide <br />additional support, the contractor is shoot- <br />ing concrete into the arch, sides, and invert <br />of the tunnel. The present heading is about <br />4,882 feet from the west portal. <br /> <br />The contractor for construction of the <br />Sugar Loaf Dam and the roads has completed <br />essentially all of the contract. Remaining <br />work consists of minor cleanup items and <br />road surfacing. Storage in Turquoise Lake, <br />which was started on April 15, 1968, now <br />amounts to 14,158 acre-feet. <br /> <br />I <br /> <br />The contractor for construction of the <br />subgrade and structures for the relocation <br />of the Denver and Rio Grande Western Railroad <br />at the Pueblo Reservoir has completed 82 per- <br />cent of the contract in 49 percent of the <br />contract time. Excavation and embankment <br />work are progressing well, and all major <br />structures are nearing completion. The out- <br />look is good for the work under this contract <br />to be essentially completed by late fall. <br /> <br />Various transmission and telephone line, <br />relocations at Ruedi, Sugar Loaf, and Pueblo <br />Reservoirs are under way or nearly completed. <br />Going to the Upper Colorado River Storage <br />