<br />CU/O <br /> <br />On the upper South Platte Unit, Missouri <br />River Basin project, the tentative reservoir <br />operation studies were revised. They are <br />now being checked to determine if further <br />refinements are essential. <br /> <br />Ii <br /> <br />Hydrolo'y studies were made for sizing <br />Turkshead Afterbay and for determining mini- <br />mum fish flows. It was concluded that mini- <br />mum flows below existing Elevenmile Canyon <br />and Cheesman Reservoirs as recommended by the <br />Fish and Wildlife Service could usually be <br />met by the normal operation of the integrated <br />system. <br /> <br />Design data for TWO Forks powerplant, <br />Turkshead Dam, switchyards, substations, and <br />transmission lines were completed and trans- <br />mitted to the Chief Engineer for preparation <br />of feasibility designs and estimates. <br /> <br />Alternative cost estimates have been <br />developed for use in the economic analysis <br />of the unit. <br /> <br />Authorization is now being sought to <br />make the feasibility investigations on the <br />Front Range Unit, Missouri River Basin <br />Project. The study area will include Boulder <br />and St. Vrain Creeks and the Cache la poudre <br />,~i ver Basins. <br /> <br />Not sh~,n on the written re~ort but <br />also in this category is the Armel unit <br />out south of Wray. This development would <br />use water out of the constructed Bonny <br />,~eservoir . <br /> <br />On the Fryingpan-Arkansas Project, <br />construction of ;~uedi Dam is essentially <br />complete. The remaining wo~k consists of <br />only minor cleanup items. Water storage <br />commenced on May 21, 1968, and by July 31 <br />the amount in storage was 39,217 acr~~feet. <br /> <br />I <br />