My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00935
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00935
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:55:38 PM
Creation date
10/4/2006 6:46:16 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/5/1968
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />v~~# <br /> <br />I <br /> <br />On the savery-Pot Hook Project substantial <br />progress has been made on the definite plan <br />report investigations. Project land classi- <br />fication and drainage review by Regional and <br />Denver personnel have been completed. The <br />project lands and drainage appendix is being <br />drafted at the present time. Plan formula- <br />tion studies are essentially complete with <br />the recommended plan consisting of an enlarge- <br />ment of the proposed Pot Hook Reservoir and <br />realigning the Pot Hook Canal at a higher <br />elevation. pot Hook Canal will also be ex- <br />tended to replace the previously planned <br />Wests ide Canal Extension. The Two Bar area <br />will be eliminated from the project plan <br />because of poor soil quality and cost of <br />facilities. Final project water supply <br />studies are under way. Geological investi- <br />gations of the canal locations are essentially <br />complete, and studies are now in progress to <br />determine the need and type of canal lining. <br />All field surveys for project features are <br />now complete. On-farm development costs and <br />farm-size studies are continuing. The definite <br />plan report is scheduled to be completed in <br />the fall of 1970. <br /> <br />I <br /> <br />under small reclamation projects, the <br />Overland Ditch and Reservoir Company, Hotch- <br />kiss, Colorado, has submitted designs and <br />estimates for the enlargement of Overland <br />Reservoir under a Small Project loan. Review <br />of the designs and estimates has been com- <br />pleted, and our suggested design changes are <br />being made by the engineer representing the <br />company. Fish and wildlife and recreation <br />evaluations by cooperating federal and state <br />agencies are in progress. <br /> <br />The Farmers Water Development Company, <br />Norwood, Colorado, has submitted a draft of <br />application report to enlarge the Gurley <br />Reservoir. Regional Office personnel plan <br />to meet with company representatives in the <br />very near future to discuss water supply <br />
The URL can be used to link to this page
Your browser does not support the video tag.