<br />I <br /> <br />Feasibility investigations consisting <br />of plan formulation studies. including possible <br />power generation at Taylor Park Reservoir. <br />and the collection of water supply field <br />data are still in progress on the Upper <br />Gunnison Project. The proposed feasibility <br />report is scheduled for completion in FY <br />1971. <br /> <br />Completion of the Yellow Jacket Project <br />proposed feasibility report is still await- <br />ing receipt of reports from some of the other <br />federal agencies. Meetings have been held <br />with representatives of these agencies in an <br />attempt to resolve this matter. The proposed <br />report is scheduled to be completed in October <br />1968. <br /> <br />The detailed land classification and <br />drainage studies for the Basalt Project have <br />essentially been completed. Field review <br />of the lands and drainage by the Regional <br />Office was completed in June 1968. Results <br />of the geological investigation for the en- <br />largement of the existing Missouri Heights <br />Reservoir were sent to the Chief Engineer's <br />office for their review and evaluation. <br />Other studies for the project are proceeding <br />satisfactorily. and the proposed feasibility <br />report is scheduled for completion at the <br />end of FY 1971. <br /> <br />I <br /> <br />Feasibility investigations will be <br />initiated on the Lower Yampa Project (formerly <br />identified as the Juniper and Great Northern <br />projects) as soon as appropriated funds are <br />made available. possibly within the next 30 <br />days. <br /> <br />We are continuing the collection and <br />tabulation of data for the Upper Colorado <br />River Comprehensive Resource Study. and <br />narrative material for the pending Basin <br />report is under way. <br /> <br />We are proceeding with the collectiop <br />