My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00930
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00930
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:55:26 PM
Creation date
10/4/2006 6:45:56 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/10/1961
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />line is the line from Flaming Gorge to Oak Creek. <br />These appropriations were made last year with <br />the full concurrence of all parties because these <br />lines are lines which are contemplated to be <br />built by the Bureau in the proposal by the pri- <br />vate companies. We certainly have no objection <br />to the Congress making further appropriations to <br />continue the construction of these lines. <br /> <br />This year, however, the Bureau is asking for <br />funds to commence construction of all segments of <br />an all-federal system. Our position at this time <br />is that we have no objection to the Bureau con- <br />tinuing construction of, or commencing construc- <br />tion of certain other non-controversial lines, <br />but as to the controversial lines, we do not be- <br />lieve that any funds should be appropriated <br />until there has been an opportunity to fully <br />reevaluate the conclusions arrived at to date by <br />the Bureau. <br /> <br />More specifically, in Colorado we do not be- <br />lieve that any funds should be appropriated for <br />the construction of a federal line east of Cure- <br />canti beyond Poncha Springs to Midway. Midway <br />is a designated point between Pueblo and Colo- <br />rado Springs. In addition, we do not believe <br />that any funds should be appropriated this year <br />to begin construction of a line between Curecanti <br />and Rangely. It is our feeling that with the <br />lines of the Bureau already under construction <br />in connection with this project, together with <br />our presently existing facilities, these facili- <br />ties will be sufficient to market the output of <br />power coming into Colorado in the initial years <br />of operation of the project: and there is no <br />necessity to commence construction of these lines <br />this year. <br /> <br />I <br /> <br />I would like to call your attention to the <br />material which is in your jackets which may give <br />you a little more information about some of the <br />things we have been talking about this morning. <br /> <br />You might have some questions you would like <br />to ask either Keith or myself. We will be happy <br />to try to answer them." <br />
The URL can be used to link to this page
Your browser does not support the video tag.