<br />.. <br />,I <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Larry Lang, CWCB <br />March 11,2005 <br />Page 2 <br /> <br />throughout the project. RPMD and its team of consultants is continually working with all impacted, <br />entities, in particular South Suburban Parks and Recreation District, to incorporate remediation <br />measures to ensure that the disturbed areas will be returned to a condition equal to or better than <br />presently exists. <br />3. South Suburban Parks and Recreation District must approve the project before CWCB action is taken. <br />RPMD has obtained approval of the pipeline alignment through City of Littleton, South Suburban <br />Parks and Recreation District arid South Platte Park property. In addition to these approvals, there will <br />be certain enhancements to the South Platte Park portion of the alignment that will be in addition to <br />the normal site restoration and re-vegetation requirements. <br />4. Project bonding, long-term warranty and liability responsibilities. All construction contracts will <br />include checking contractor pre-qualification statements, proof of bonding and insurance capabilities, <br />references, change order and warranty follow up history, and ability to work in public and <br />environmentally sensitive areas. <br />5. Easement fee analysis. CWCB staff have presented an initial cost for the easement. RPMD will <br />respond to this at the March 22, 2005 Board Meeting. <br />6. Approvalfrom other interested governmental entities. There are a number of governmentaVmunicipal <br />entities and utility companies that are currently involved with and impacted by this project. Approval <br />has been obtained from the following entities; City of Littleton, South Suburban Parks and Recreation <br />District, Colorado Department of Public Health and Environment, US Army Corps of Engineers, <br />Denver Water, Colorado Department of Transportation, Denver Botanic Gardens at Chatfield, <br />Lockheed Martin Space Systems, Colorado State Parks~ and Public Service Company of Colorado. <br />7. Complete application submittal to CWCB. The attached easement application and preliminary <br />construction drawings are considered a complete application for review and approval by CWCB. As <br />noted on the application and in this letter, legal descriptions and exhibits of the pipeline easement will <br />be prepared as construction is completed. There will be minimal change to the alignment as shown on <br />these preliminary construction drawings. All survey, construction drawings, legal descriptions and <br />exhibits are and will continue to be prepared from GPS field survey on the 1983 State Plane horizontal <br />coordinate system and 1988 USGS vertical datum. A survey control plan will be prepared for the <br />entire project. All such information will be available for use by CWCB. <br />8. Show accurate survey of existingfeatures. All existing features, above ground and below ground <br />utilities, property lines, easements and public infrastructure will be shown on the construction <br />drawings using the horizontal and vertical control described above. <br />9. Construction management and safety programs. The construction contract documents and technical <br />specifications will address these issues. In addition notes and specification references will be included <br />on the construction drawings for ease of reference. All impacted/approving entities, including the <br />CWCB will be given the opportunity to review and comment on the construction plans, contract <br />documents and specifications as they are being prepared. <br /> <br />RP,MD is requesting approval of this easement request application by the Board of Directors at the March 22, <br />2005 Board Meeting. <br /> <br />~o <br />~~ <br /> <br />General Manager <br />Roxborough Park Metropolitan District <br /> <br />