My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00917
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00917
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:55:16 PM
Creation date
10/4/2006 6:45:46 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/22/2005
Description
Flood Section - South Platte River Easement Request - Roxborough Park Metropolitan District
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />/ <br />,J <br /> <br />-2- <br /> <br />. <br /> <br />. Colorado Department of Transportation <br />. Centennial Water and Sanitation District <br />. Denver Regional Council of Governments <br />. Colorado Water Conservation Board <br /> <br />) <br /> <br />CWCB will. also contact the Urban Drainage & Flood Control District to discuss the project and receive technical <br />input. The Applicant has provided a vicinity map, which outlines the general project alignment, and a pipeline <br />alignment map within the CWCB ROW. <br /> <br />. <br /> <br />Staff Concerns and Issues with this Request <br />On October 28, 2004, staff met with Roxborough Park Metropolitan District to review their, proposal. Their <br />requested alignment will parallel the Chatfield hnprovement Channel Project, cross a number of existing CWCB <br />easements, impact the South Suburban Parks and Recreation District (District) trail system, and impact a number of <br />South Suburban Par~ facilities. This is an unusually BIG request with ~ number of important staff concerns <br />and issues! - F, \\U 1.1\~?~~'\"V\ tJ~\Jt""\')~-t '1\ ~()'\ , ' <br /> <br />The staff concems/issues are: <br />~1. Does the Board want to tie-up a large portion of the CWCB ROW for one project? <br />2. Reclamation and mitigation measures during construction activities must be fully addressed. <br />. 3. The District must approve the proj~ct plan before any CWCB action is taken. <br />4., Project bonding and 10ng-tenn project warranty and liability responsibilities must be addressed. <br />~ 5. The Applicant must provide the CWCB with an easement fee value under Method I - Market Value <br />Method. Note: It is recommended that the applicant review the existing fee values from other utility <br />companies/agencies/districts. ' <br />--6. Before an easement agreement can be executed, Roxborough Park Metropolitan District must obtain project <br />, approval from the other interested governmental entities. <br />7. Before official CWCB action is taken on this request, staff must receive a complete application including a <br />, fully controlled GPS layout map for the project. <br />8. The project layout map must have XYZ values (horizontal and vertical data) to detennine the area and <br />depth references to existing project features. <br />-9. The applicant must provide a construction management safety program for all activities within CWCB <br />ROW ljreas. <br /> <br />\ J' <br /> <br />, Use for the Requested Easement <br />The uses for the CWCB land are for the construction of a major wastewater pipeline that would serve a large service <br />area. Staff will not be able' to determine the specific impacts from this easement request, and will not be' able to <br />evaluate how the proposed project would work with existing uses/easement agreements, until more detailed project <br />information is provided by the Applicant. However, staff believes that a feasible solution may exist that would allow <br />for cooperation with the Applicant and that would allow the Board to seriously cOlisider the request. <br /> <br />Staff Request <br />Staff requests Board feedback related to this agenda item and is seeking an expression of general support <br />or opposition to the Applicant's conceptual proposal. The Board may want to recommend that the <br />Roxborough Park Metropolitan District proceed with their feasibilities studies and then submit an official , <br />easement application for future Board consideration. <br /> <br />. <br /> <br />Flood Protection. Wate!' Project Planbing and Financing. Stream and Lake Protection . <br />Water Supply Protection. Conservation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.