Laserfiche WebLink
<br />I <br />,; <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />-3- <br /> <br />3) <br /> <br />INSURANCE COVERAGE - The CWCB shall be named as an additional insured, and shall <br />have coverage in the amounts established by the Colorado Governmental Immunity Act - part <br />one of article 10 oftit1e 24, lOa C.R.S., as amended. <br /> <br />4) FEE CONSIDERATIONS - A recommendation will be made that is in compliance with the <br />standard fee consideration for this request under the provisions of Method II and Method III. <br /> <br />5) RECLAMATION OF THE SITE - The reclamation plan and all site grading shall be developed <br />and provided to the CWCB for approval prior to the construction and completion of the project. <br /> <br />6) NON-EXCLUSIVE EASEMENT CLAUSE - Language will be stated in the easement that will <br />reserve the CWCB's right to grant additional easements on the same land covered by this <br />easement. <br /> <br />7) EASEMENT APPLICATION - The applicant and/or agent have complied with the provisions <br />of the Colorado Water Conservation Board Easement Guidelines for the Chatfield Downstream <br />Channel hnprovement Project dated November 2001. <br /> <br />Special Fee and Easement Considerations <br />CWCB Procedures for computing easement fees for the CWCB South Platter River Right of Way <br />Easements use three methods. Method I is the Market value method, Method II is the drainage pipeline <br />value method and Method III is for Governmental Public Works Facilities. <br /> <br />. Using Method II for pipeline, the fee consideration is (192,360 square feet @ $1.00 sq. ft. equals <br />cost of$ 192,360.00) $192,360.00. <br />. Using Method III with special considerations, a negotiated fee of $50,000 with other <br />engineering considerations will be paid or donated to the South Platte River Chatfield <br />Downstream Channel hnprovement Project Maintenance Activities. <br /> <br />Method III states "Should it be deemed by the Board that it is in the best interest of the general public, <br />the Board may consider a special assessment for a City, Town or County on a case-by-case basis for an <br />easement request." <br /> <br />RECOMMENDATION <br />Following a review by the AG's Office and CWCB staff for Agenda Item 20, staff recommends that the <br />Board: <br />Approve the construction easement and non-exclusive easement request for the Roxborough <br />Park Metropolitan District Waster Regionalization Project, Littleton - Englewood, Colorado on <br />CWCB right-of-way under Method III fee considerations, which shall include a $50,000 fee, <br />and other considerations. Authorize staff to prepare the necessary easement documents and the <br />Director to execute said documents. It should be further recommended that the grantee shall <br />implement a safety construction program, special engineering designs for existing project <br />features in the CWCB ROW, and replace and reclaim all existing project features and <br />landscapes. <br /> <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />