My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00910
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00910
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:55:15 PM
Creation date
10/4/2006 6:45:45 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/13/1998
Description
CF Section - Feasibility Studies - Ryan Gulch Reservoir Co. - Request for Feasibility Study Grant
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />Ryan Gulch Spillway Rehabilitation Study <br />Plan of Study <br />Page 5 <br />ESTIMATED COST <br />The summary of the estimated task costs are shown in the following table: <br /> <br />Task No. Description Estimated <br /> Cost <br />1 Data Collection $192 <br />2 Hydrologic Analysis 192 <br />3 Alternative Development 4,820 <br />4 Alternative Evaluation 1,920 <br />5 Financial Analysis 768 <br />6 Study Report 842 <br />7 Coordination Meetings 1,536 <br /> Subtotal Salary Costs $10,270 <br />. Subtotal Direct Costs <br />(Telephone, Reproduction, Mileage, and Postage) $630 <br /> TOTAL PROJECT COST $10,900 <br /> <br />. <br /> <br />D:IPROJECTSIRY ANIRA YN.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.