My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00910
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00910
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:55:15 PM
Creation date
10/4/2006 6:45:45 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/13/1998
Description
CF Section - Feasibility Studies - Ryan Gulch Reservoir Co. - Request for Feasibility Study Grant
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'" <br /> <br />Boyle Engineering has submitted a plan of study for the feasibility study with a cost <br />estimate of $10,900 and a completion date of August 3 J, 1998. Staff has reviewed and <br />approved the plan of study (copy attached). A $5,000 grant would amount to about 50 <br />percent of the estimated cost of the study. <br /> <br />, <br />. <br /> <br />Upon completion of the study, and if the project is found to be feasible, the Ryan Gulch <br />Reservoir Company intends to apply to the Board in November 1998 for funding of the <br />spillway enlargement in 1999. . <br /> <br />Recommendation <br /> <br />Staff recommends that the Board approve a grant from the Operational Account of the <br />Severance Tax Trust Fund in FY '99 to the Ryan Gulch Reservoir Company for 50 <br />percent of the cost of the Ryan Gulch Spillway Rehabilitation Study, not to exceed <br />$5,000.00. <br /> <br />Cc: Harold Kester, Ryan Gulch Res. Co. <br />Ed Toms, Boyle Engr, <br />Linda Bassi, AGO <br /> <br />. <br /> <br />. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.