My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00900
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:55:06 PM
Creation date
10/4/2006 6:45:34 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/21/2002
Description
WSP Section - Platte River Endangered Species Cooperative Agreement
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />District Engineer <br />U,S. Anny Corps of Engineers, Albuquerque District <br />AITN: Civil Works Planning and Project Management Division <br />4101 Jefferson Plaza, NE <br />Albuquerque, NM 87109 <br /> <br />Dear Sir: <br /> <br />This letter is to seek the assistance of the U.S. Anny Corps of Engineers under Section 593 of the Water Resources Development Act of 1999 <br />In the fonn of design and construction for the publicly owned wastewater treatment facilities servicing (city or town, etc.), <br /> <br />(Briefly describe the nature and severity of the problem and the facilities needed to correct the problem. <br /> <br />We understand that once a project cooperation agreement (PCA) is completed, it is understood that, the non-federal sponsor would be <br />required to pay 25% of the cost for the project. Non-federal credit for the design work shall exceed 6% of the total construction cost. The <br />non-federal interest shall also receive credit for land, easements, rights-of-way, and relocations toward the non-federal share of project costs <br />(including all reasonable costs associated with obtaining pemzits necessary for the construction, operation, and maintenance of the project <br />on publicly owned or controlled land, but not to exceed 25% of the total project cost), Once the project is constructed, the non-federal share <br />of operation and maintenance costs shall be 100%. <br /> <br />Please contact (name, address, and telephone}for further ilifomzation. <br /> <br />Sincerely, <br />(Name and Title of public official authorized to request assistance) <br /> <br />For further infonnation please see point of contact page. <br />
The URL can be used to link to this page
Your browser does not support the video tag.