My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00893
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00893
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:55:01 PM
Creation date
10/4/2006 6:45:29 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/20/2000
Description
CF Section - Loan De-Authorization Review
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />n) Summit Res. & Irrigation Co. - Summit Ditch Svstem Rehabilitation - A Construction <br />Fund Loan of $200,000 was authorized in SB 97-008 to rehabilitate the Summit Reservoir and <br />Irrigation Company's existing irrigation system. To-date the Ditch Company has completed <br />$129,319.62 worth of improvements to their system. Their remaining project is to pipe the South <br />Main Ditch, which is currently on hold until right-of-way issues are resolved. The Ditch <br />Company is tentatively planning on having the necessary right-of-way in-place by spring of 200 1, <br />with construction to follow in the summer/fall of 200!. The Ditch Company has formally <br />requested that the loan be continued at this time. <br /> <br />Staff Recommendation - Staff recommends that the Summit Reservoir and Irrigation Company <br />construction loan, as authorized in SB 97-008, be continued at this time. <br /> <br />0) City of Victor - Victor Reservoir #2 Dam Rehabilitation - The City of Victor's Reservoir <br />NO.2 is in critical need of rehabilitation. The City has an authorization for a Construction Fund <br />loan of $600,000 in HB 95-1155 for the rehabilitation project. Conditions of Board approval <br />include a completed feasibility study and a staff analysis of the City's repayment capacity. <br />The City recently received a grant from the Colorado Department of Local Affairs to offset a <br />portion of the project costs and enhance the financial feasibility ot the project. The City and their <br />consultants are expected to complete the feasibility study this month and staff analysis of the <br />City's repayment capacity will be conducted shortly thereafter. Attached is a letter from the City <br />requesting that the existing authorization be continued. <br /> <br />Staff Recommendation - Staff recommends that the existing authorization in HB 95-1155 for tC~ <br />Victor Reser/air W':' Dam Rehabilitation be cOlitinued for another year. <br /> <br />p) The San Luis Vallev Canal Company - Diversion (Check) Structure - A Construction <br />Fund loan of$188,000 was authorize\! in SB 97-008 for rehabilitation ofa check structure on the <br />San Luis Valley Canal. The Company has completed the project with its own funds and does not <br />need CWCB financing. The Company has requested the loan be deauthorized at this time. <br /> <br />Staff Recommendation - Staff recommends that the San Luis Valley Canal Company loan, as <br />authorized in SB 97-008, be de-authorized at this time. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.