My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00883
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00883
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:54:57 PM
Creation date
10/4/2006 6:45:23 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/23/2002
Description
Strategic Plan and Attachments
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Background (Continued) <br /> <br />The CWCB recommends adoption of an aIternative <br />developed in August 2000 by a workgroup in Craig, <br />Colorado. The specific elements of that alternative <br />are as follows: <br /> <br />. Lease up to 2,000 AF per year from Steamboat <br />Lake, An existing lease between the USFWS and <br />the Colorado Division of Parks and Outdoor <br />Recreation was extended through November 2001. <br />We anticipate renewal of that lease for a term of <br />no less than 5 years, beginning in 2002. <br /> <br />. Enlarge Elkhead Reservoir to provide 3,700 AF <br />per year for late summer releases for endangered <br />fish. Additional storage (~4,300 AF) may be <br />included to meet future human and other needs. <br />The cost of the latter increment would be paid by <br />Colorado or other source(s) outside the Recovery <br />Program. <br /> <br />. The balance of augmentation (1,300 AF) would <br />likely be provided through a lease between the <br />Recovery Program and Colorado River Water <br />Conservation District (River District). This <br />volume could be provided from the proposed <br />human use pool at Elkheadandlor from a new <br />tributary reservoir. The River District recently <br />completed a Small Reservoir Reconnaissance <br />Study that may lead to construction of one or more <br />such reservoirs. <br /> <br />The Yampa River Management Plan was developed <br />over many months following a collaborative process <br />by a workgroup consisting of local stakeholders, state <br />and federal agencies and environmental groups. This <br />process culminated with a facilitated public meeting <br />in Craig in August 2000. <br /> <br />The PBO will not cap the amount of water that can be <br />developed in the Yampa Basin. Rather, it will protect <br />the right to develop a certain amount of water within a <br />timeframe, whose impacts can be scientifically <br />analyzed using the best available data. <br /> <br />For the Yampa River Basin, this data has included <br />demand projection studies undertaken by the River <br />District, water use models applied by the CWCB <br />using the Decision Support Systems and biological <br />information from the USFWS and the Colorado <br />Division of Wildlife. <br /> <br />The Program will pay the cost of implementing the <br />Yampa River Management Plan. <br /> <br />Process Steps <br /> <br />1. Draft Management Plan published Oct. 2001. <br />Public meetings held on Nov. 27 (Steamboat <br />Springs), Nov. 28 (Baggs, WY), and Nov. 29 <br />(Craig) . <br /> <br />,2. Revise plan following public comment period <br />(closed Dec. 14,2001). <br /> <br />3, Complete Biological A.ssessment on Plan and <br />submit to USFWS by Jan. 31, 2002. Initiate <br />Section 7 consultation that will result in a <br />Programmatic Biological Opinion (PBO). <br /> <br />4. Complete a draft Environmental Assessment <br />(EA) pursuant to NEPA by April 30, 2002, <br />subject to a 30-day public comment period. <br /> <br />; 5. Submit final EA by June 30,2002. <br /> <br />6. USFWS to issue PBO by July 31, 2002 to <br />provide ESA compliance, including incidental <br />take coverage, for all existing depletions, as <br />well as 30,000 AF per year of new depletions, <br />anticipated to meet Colorado's needs in the <br />Yampa Basin through 2045. An additional <br />. 20,000 AF per year may be developed when <br />the first depletion increment is completely <br />developed... A.t that time, the Plan and the .. . <br />status of the fish (if still listed) will again be <br />reviewed, and the PBO may be revised. <br /> <br />7. The States of Colorado and Wyoming, the <br />USFWS, and possibly others will sign a <br />Cooperative Agreement to implement the <br />Plan after all NEP A and ESA requirements <br />have been met. <br /> <br />8. hnplementation of the Plan will serve as a <br />"reasonable and prudent alternative" under <br />the PBO to protect endangered fishes as water <br />development continues in the Yampa Basin. <br /> <br />Conclusion <br /> <br />The Yampa River Basin Management Plan charts <br />a clear course for implementation ofthe Recovery <br />Program in the Yampa Basin, providing ESA <br />compliance to meet existing and future human <br />water needs in the basin, as well as measures to <br />benefit its endangered fishes. <br /> <br />For information about this or other water resource topics <br />contact the CWCB at: 1313 Sherman Street, Room 721. <br />Denver, CO 80203. Phone: (303) 866-3441, FAX: (303) <br />866-4474 Web site: htto://cwcb.state.co.us <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.