My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00871
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00871
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:54:52 PM
Creation date
10/4/2006 6:45:20 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/10/2002
Description
Watershed Protection Fund
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-..:' '''-- <br /> <br />Paonia, North Fork of <br />Gunnison River <br /> <br />Pueblo, Arkansas River <br />Fisheries Habitat <br />Restoration <br /> <br />Feasibility <br /> <br />May 2003 <br /> <br />Plans and Nov 2003 <br />Specifications <br /> <br />tn November 1998, Congressman Scott Mcinnis North Fork <br />provided a Jetter of support for the project. The River <br />proposed project consists of various channel and Improvement <br />river corridor restoration measures at 11 sites Association <br />within a 12-mile stretch of the North Fork of the <br />Gunnison River. Likely project features include: <br />bankfull channel reconfiguration, riverine <br />wetlands reconstruction, biotechnical bank <br />protection. removal of exotic vegetation, <br />floodplain revegetation, reconfiguration of <br />irrigation diversions, and in-stream habitat <br />features. The project would enhance fish and <br />wildlife habitat, expand wetlands, revegetate the <br />river's floodplain, improve water quality, <br />conserve water, provide public access for fishing <br />and boating, and educate the community about <br />the river. <br /> <br />The project is located along 10 miles of the City of Pueblo <br />Arkansas River from Pueblo Reservoir to the <br />Fountain Creek confluence near Pueblo, CO. <br />The project consists of fish habitat structures, <br />low-flow channel development, meander <br />development, exotic vegetation control, native <br />vegetation establishment, and a fish passage <br />structure. The feasibility report was approved in <br />October 2001. <br /> <br />$660,000 <br /> <br />Not available <br /> <br />$7.2 million Feasibility Study in <br />Progress <br /> <br />$6.6 million The peA was signed in <br />April 2002. The <br />construction drawings! <br />specifications and real <br />estate acquisition is <br />underway. Construction <br />funds have been <br />committed to the project <br />and construction is <br />scheduled to begin in the <br />fail of 2003. <br />
The URL can be used to link to this page
Your browser does not support the video tag.