Laserfiche WebLink
<br /> <br />Data Collection Field Trip: On Aug. 7 and 8 Mark Uppendahl met with the Roy Smith and Dave <br />Gilbcrt ofthc Burcau of Land Management (BLM) to assist with thcir required field data collection <br />cffort rcgarding thc BLM 's proposcd Water Division J Instream Flow Recommendations. The field trip <br />allowcd thc CWCB staff an opp0l1unity to visit some of the proposed instream flow segmcnts (see <br />Figures 1-4) and an opportunity to continuc working with the BLM in a positive and proactive manner <br />. .-!J.\t ~~ 'f' ;~tr' "." .~~..'Tj;I" <br />fi-, ;. " ',i r?i~I.j.;. 9J $1 <br />?i ( '~J(l $ !in <br />~; <br /> <br />)0 <br /> <br /> <br />. <br /> <br />. <br /> <br />to address their instream flow needs. <br /> <br /> <br />Fil!ure I: La Garita Creek <br /> <br />Fil!ure 2: Brook Creek <br /> <br /> <br /> <br />Fil!ure 3: Eal!lebrook Creek <br /> <br />Fie:ure 4: Raspberry Creek <br /> <br />. <br /> <br />Alamosa River Restoration: We continue to work with thc Alamosa River Restoration Foundation in <br />the implemcntation ofthc contract for $450,000 in Construction Funds. The contract is for design and <br />construction of river rcstoration improvements in the 4 - 5 mile reach around the community of Capulin <br />(about 8 miles upstream of Highway 285), Design work is continuing at this time and work is still <br />underway to acquire allnccessary pem1its for the rock that will be used to build structures in the river <br />channel. <br /> <br />21 <br />