Laserfiche WebLink
<br />DRAFT <br /> <br />10/5/82 <br /> <br />Revisions to Exhibit B <br />Scope of Services <br />Contract Between the <br />State of Colorado <br />and <br />Tudor Engineering Company <br />Dated January 1,1982 <br />(October , 1982) <br /> <br />Introduction <br /> <br />The revisions set forth below shall supersede in their <br /> <br />entirety Tasks 12 and 13 under the heading "Task Descriptions" <br />(at pages 8, 9, and 10) and items numbered 4 and 5 under the <br /> <br />heading "Study Schedule" (at page 11) in Exhibit B. In addition, <br /> <br />these revisons shall also supersede in their entirety Tasks 12 <br /> <br />and 13 of the Detailed Plan of Study (revised March 18, 1982) and <br /> <br />any milestones listed in the Detailed Plan of Study which are <br /> <br />inconsistent with the revised schedule set forth herein. <br /> <br />222 <br />jwm/r <br />