My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting 10/07/1982
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
Board Meeting 10/07/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:54:34 PM
Creation date
10/4/2006 6:44:49 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
10/7/1982
Description
CWCB Meeting
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />In light of the legislative intent of S.B. 439 and the <br />constraints on funding, none of the four studies analyze the <br />environmental, recreational, a.nd social impacts which these four <br />projects would have. Such eva.luations will, of course, have to <br />be undertaken before any final decision is made to construct any <br />of the four proposed projects. <br /> <br />Conduct of Studies <br /> <br />All four studies are being carried out by engineering <br />consulting firms under contra~t to the CWCB. The firms are: <br /> <br />Cache la poudre <br />Hardin Dam -- <br />Una Dam -- <br />Yellowjacket -- <br /> <br />Tudor Engineering <br />Dames and Moore <br />R.W. Beck <br />International Engineering <br /> <br />Under the guidance of the CWCa staff, these firms are responsible <br />for executing all aspects of ~ach study and for the preparation <br />of all necessary documentation and reports. Final decisions <br />concerning the scope, content, and conduct of the studies are <br />being made by the Board itselt. <br /> <br />Advisors panels composed of knowledgeable individuals <br />representing a wide range of ~nterests have been assembled for <br />each study. Functions of eacn advisors panel include review of <br />interim written products and c3raft final reports and advising on <br />the content and conduct of ea<:h study. The advisors panels have <br />met several times during the c:ourse of the studies. <br /> <br />Status of Studies <br /> <br />The attached "Status Rep<lrt" very briefly reviews progress <br />on each study and identifies the major features of each potential <br />project. The schedule for completion of reports is as follows: <br /> <br /> D1:'aft Final <br />Project R~port Report <br />Cache * h.te January early March <br />Hardin Oct. 15 Dec. 15 <br />Una Nov. 1 Jan. <br />Yellowj acket D~c. Jan. 15 <br /> <br />"Schedule being revlewed at this time. <br /> <br />JTtlM/gl <br />Encl: as stated <br />cc: see attached <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.