My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00836
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00836
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:54:30 PM
Creation date
10/4/2006 6:44:46 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/6/1956
Description
Minutes and Resolution
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />489 <br /> <br />MR. MOSES: <br /> <br />MR. JERMAN: <br /> <br />- 34 - <br /> <br />We would like to have estimates made on <br />the feasibility of making a pressure tunnel, <br />or lining the present rock part of it with <br />concrete so as to increase the flow. I I <br />believe the Bureau now realizes the fact <br />that about half of that Gunnison Tunnel is <br />through solid rock which is rough, and <br />turbulence in the water cuts down the flow. <br />We have thought of possible development <br />on the Uncompahgre to make up for that lack <br />of water through the Gunnison Tunnel <br />which might be better. But we would like <br />both possibilities investigated with the <br />idea in mind that there will be times when <br />there is not enough water available from the <br />Gunnison River to provide that water even <br />should the tunnel carry it. At the present <br />time we are releasing from the Taylor <br />Park Reservoir 950.second feet of water to <br />get 925 feet through the tunnel. That <br />would,indicate there is not only water <br />available to us, but we also lose about 25 feet, <br />We would like to use the Gunnison Tunnel <br />while the water is available from the <br />Gunnison River and then resort to storage <br />on the Uncompahgre when the water is <br />not available." <br /> <br />"The next is ~rogress Report of the <br />Bureau of Reclamation and Mr. Jerman, <br />Project Division Engineer, Region 4. (See <br />Appendix B)." <br /> <br />"I think it was at your last meeting I <br />gave you a report pretty much in detail. <br />The wheels of progress move slowly. What <br />I may say today may only add to it. I want <br />to compliment ~our very able manager of the <br />Uncompahgre Project. In the last five years <br />we have heard many complimentary remarks. <br /> <br />This brings us to the Small Projects <br />Act. It has been signed by the President. <br />We feel there was, some miscue in there and <br />any corrections would take another law. The <br />Secretary was directed to take the steps <br />that may be necessary to start formulating <br />rules and regulations and receive applications <br />for loans under that Act, knowing there <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.