Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Durkee Ditch Companv - Rehabilitation of the Durkee Ditch <br /> <br />Authorization: SB 97-008 <br />Water Source: Currant Creek <br />Terms of Loan: $120,000 @ 3.75% for 30 yrs <br /> <br />County: Delta - E of Orchard City <br />Project Yield: 2,000 ac.ft. <br />Project Type: Headgate and Pipeline <br /> <br />This $343,000 project is the construction of a new concrete headgate and turnouts, and <br />construction of approximately 13,000 feet ofPVC pipeline replacing an open channel ditch in Delta <br />County northeast of Delta, Colorado. The Delta and Grand Junction Office of the Natural Resource <br />Conservation Service prepared project design. Project construction commenced September 8, 1997 <br />by K C Equipment and Consulting of Delta, Colorado. Phase I of the project was completed in <br />December 1997 with the final Phase II scheduled for completion in October 1998. The project is <br />currently 50% complete. <br /> <br />Excelsior Irrigating Companv - Excelsior Ditch Rehabilitation <br /> <br />Authorization: SB 97-008 <br />Water Source: Arkansas River <br />Terms of Loan: $230,000 @ 3.75% for 30 yrs <br /> <br />County: Pueblo - E of Pueblo <br />Project Yield: 4,250 ac.ft. <br />Project Type: Ditch Rehab/Recharge Ponds <br /> <br />This $335,000 project is the re-construction of approximately 2 miles of open ditch, which <br />has previously been abandoned and farmed over. Also included in the project is the construction of <br />several pump stations for water delivery. The project is located in Pueblo County 10 miles east of <br />Pueblo. Project design was prepared by the Pueblo Office of the Natural Resource Conservation <br />Service, Ralph Adkins, P.E. of Pueblo, Irrigation Engineering of Alarnosa and Hendrooke <br />Sprinklers of Ft. Collins. Project construction commenced in May 1998 with project completion <br />scheduled for December 1998. <br /> <br />Lefthand Ditch Company - Rehabilitation ofLefthand Vallev Reservoir <br /> <br />Authorization: HB 95-1155 <br />Water Source: Lefthand Creek <br />Terms of Loan: $560,000 @ 4.5% for 30 years <br /> <br />County: Boulder - N of Boulder <br />Project Yield: 1,624 ac.ft. <br />Project Type: Dam Rehabilitation <br /> <br />This project is the result of the State Engineer's order to increase the spillway capacity of <br />the Lefthand Valley Reservoir in order to comply with dam safety rules and regulations regarding <br />downstream structures. The project includes the replacement of the current spillway with a larger <br />roller compacted concrete spillway and stilling basin. Rocky Mountain Consultants of Longrnont, <br />Colorado completed the permitting process, design engineering and preparation of construction <br />contract documents. The construction contract was awarded to Gears, Inc. of Crested Butte and <br />construction commenced September 1, 1998. <br />