My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00818
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00818
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:54:16 PM
Creation date
10/4/2006 6:44:19 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/21/1998
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SAN LIDS WATER CONSERVANCY DIST - GROUNDWATER RECHARGE PROJECT <br />:A.~". ."~o.c,,',~\. .,~";,,~.,r.i;/,,..:'J"~"""'''''_~I!:~. .' .'. . '. --- - ~- - -c~'t'~1\'1.l!~ <br />'~ . ' '~-('---';-'~':+'7~;~~;'~S'-l <br /> <br /> <br />Groundwater Recharge Basin Northeast of Del Norte <br /> <br />Proiect Description <br /> <br />. This $90,000 project was the study of a groundwater recharge operation for the San Luis <br />Water Conservancy District in Alamosa County northeast of Del Norte, The project consisted of <br />diverting ditch water into three shallow (1-3 feet) recharge basins and construction of several <br />observation wells in order to document the effect the project had on the area's groundwater <br />levels. Davis Engineering Service, Inc. of Del Norte prepared the project design that was <br />constructed by Cooley Brothers, Inc. of Mosca, Colorado commencing in May 1993. The study <br />data was analyzed and presented in a final report to the CWCB August 10, 1998. <br /> <br />Proiect Data <br /> <br />Sponsor: San Luis Water Conservancy District <br /> <br />County: AIamosa <br /> <br />River: Rio Grande <br /> <br />Terms of Loan: $45,000 Grant @ 50% project cost Substantial Completion Date: Aug.lO,1998 <br /> <br />Design Engineer: Davis Engineering Service, Inc. - Del Norte, Colorado <br /> <br />Construction Contractor: Cooley Brothers, Inc. - Mosca, Colorado - (Recharge Basins) <br />Bureau of Reclamation (Well drilling) <br /> <br />Design Criteria: <br /> <br />3 - Project Recharge Basins <br />15 - Observation Wells <br />16 - Cost Share Recharge Sites (Closed Basin Area) <br /> <br />. <br /> <br />Annual Volume of Water Delivered by the Project: N/A <br />
The URL can be used to link to this page
Your browser does not support the video tag.