My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00818
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00818
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:54:16 PM
Creation date
10/4/2006 6:44:19 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/21/1998
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Denver Museum of Natural Historv - Denver Basin Aquifer Geo-Hvdrologic Core Studv <br /> <br />Authorization: SB 98- 1189 <br />Water Source: Denver Basin Aquifers <br />Terms of Loan: $90,000 Grant <br /> <br />County: Elbert - S of Kiowa' <br />Project Yield: N/ A <br />Project Type: Geo-Hydrologic Study <br /> <br />. <br /> <br />This project is the acquisition of a 2,000-foot core of the Denver Basin aquifers near Kiowa <br />in the c.entral Denver Basin. The purpose of the core is to help develop an integrated hydrologic <br />and geologic framework for the Denver Basin aquifers. This will enable State, County, and <br />municipal planners to promote appropriate development of the Basin's water resources. This core- <br />drilling project is part of a three-year National Science Foundation research study that will focus on <br />the evolution of the Denver Basin and its landscapes. Drilling is planned to begin in early 1999. <br /> <br />Proiects to be De-Authorized <br /> <br />Greelev. City of - Twin Lakes Reservoir Dam Replacement <br /> <br />. <br /> <br />Authorization: SB 87-15 & SB 98-1189 <br />Water Source: Cache la Poudre River <br />Terms of Loan: $787,000 @ 5% for 30 years <br /> <br />County: Larimer- W ofFt. Collins <br />. Project Yield: 278 ac.ft. <br />Project Type: Darn Rehabilitation <br /> <br />This project consists of the complete removal and replacement of the City of Greeley's <br />Twin Lakes earth embankment darn along its original location and alignment. ECI, Inc. of Denver <br />designed the project with the construction contract awarded to Zak Dirt of Longmont in June 1998. <br />Construction is scheduled for completion in December 1998. The City of Greeley has developed <br />alternative project fmancing and has requested that their $787,000 CWCB loan authorization be de- <br />authorized. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.