My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00818
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00818
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:54:16 PM
Creation date
10/4/2006 6:44:19 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/21/1998
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />721 Centennial Building <br />'313 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866,4474 <br /> <br />STATE OF COLORI\DO <br /> <br />8 <br /> <br />MEMORANDUM <br /> <br />Roy Romer <br />Governor <br />James S. Lochhead <br />Executive Director, ONR <br />D<lriesC. Ute, P.E. <br />Director, eweB <br />Peter H. Evans <br />Acting Director, eWeB <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members ~. <br /> <br />Bill Stanton, P.E., Chief, Project Planning and Construction Sfjrt. . <br />Mike Serlet, P.E., Design and Construction Project Manager rrp . <br /> <br />September 15,1998 <br /> <br />FROM: <br /> <br />DATE: <br /> <br />SUBJECT: <br /> <br />Agenda Item 16f - September 21-22,1998, Board Meeting <br />Water Project Construction Loan Program <br />Design and Construction Status Report <br /> <br />The CWCB Project Planning and Construction Section has completed 4 projects in FY 98- <br />99. Currently we have 10 projects under construction and 16 projects in the design phase. <br /> <br />. <br /> <br />The attached spreadsheet summarizes project status including budget, construction <br />schedule, and progress to date. 4 projects were completed during the current reporting and are <br />described following the progress report. <br /> <br />The following progress report briefly outlines all active project design and construction <br />information and progress to date. <br /> <br />Proiects Under Construction <br /> <br />Johnstown. Town of - Raw Water Pipeline <br /> <br />Authorization: SB 94-29 <br />Water Source: Big Thompson River <br />Terms of Loan: $2,500,000 @4% for 30 years <br /> <br />County: Larimer/Weld - W of Johnstown <br />Project Yield: 2,200 ac.ft. <br />Project Type: Pipeline Construction <br /> <br />. <br /> <br />The project includes the replacement of 1 1 miles of open ditch with a 14- 1 6 inch pipeline <br />from Lonetree Reservoir to the Town of Johnstown's water treatment plant including a booster <br />station at the reservoir and connection facilities at the treatment plant. PRC Environmental <br />Management, Inc. of Denver designed the project. The construction contract was awarded to Hall- <br />Irwin Construction Co. of Greeley and B.T. Construction, Inc. of Broomfield August 6, 1996. <br />Construction commenced in early October 1996 and was completed in June 1997. Project <br />documentation and fmal accounting is currently underway with substantial completion scheduled in <br />September 1998. <br />
The URL can be used to link to this page
Your browser does not support the video tag.