Laserfiche WebLink
<br /> <br />.,... <br /> <br />. <br /> <br />e <br /> <br />. <br /> <br />. <br /> <br />Water Supply Finance and Construction Program - Project Data <br /> <br /> <br />Applicant: Colorado Water Conservation Board County: <br />Project Name: Chatfield Reservoir Reallocation Study <br />Project Type: Flood Protection Program Water Source: NI A <br />Drainage Basin: South Platte River <br />Total Project Cost: $192,500 <br />Type of Grantee: State Government <br />CWCB Non-Reimbursable Inv.: $192,500 <br /> <br />Douglas/! efferson <br /> <br />Funding Source: CWCB Const. Fund <br />Median Household income: N/A <br /> <br />Interest Rate: NI A <br /> <br />Term: N/A <br /> <br />SUMMARY <br />On January 1,2000, the Colorado Water Conservation Board (Board) and the U.S. Anny Corps of Engineers <br />(Corps) commenced with the Chatfield Reservoir Reallocation Study (Study). The Board and Corps are the <br />Study Sponsors and have contracted Simons and Associates (Contractor) for the performance of the study. The <br />Study Sponsors prepared a detailed "Scope of Work" for the accomplishment of the required study tasks. The <br />Study Sponsors successfully negotiated a contract with the Contractor and gave a "Notice to Proceed" on <br />January I, 2000. <br /> <br />The purpose of the Study is to determine what opportunities may exist for the reallocation of the existing <br />reservoir storage. The existing reservoir provides a high degree of flood protection and recreational activities <br />for the Denver Metropolitan Area. Chatfield Reservoir does curently provide limited water supply storage. <br />Many water suppliers have requested that the Board and Corps perform this study to determine if additional <br />water supply storage can be made available within the existing facility. <br /> <br />As expected for this very complex study, additional tasks have come forth during the study. These required <br />tasks and study opportunities are: <br />1. Environmental investigations $25,000.00 <br />2. Seismic (earthquake) investigations $17,500.00 <br />3. Recreational planning and facility design $100,000.00 <br />4. Hazard delineation and analyze $50.000.00 <br />Total $192,500.00 <br /> <br /> <br />Project location <br /> <br />f <br /> <br />, <br />./'--'~nt&1/i. <br />,,- Alamo - -'="- <br />" 1\", <br />".~~Q088 Sptlll(l,8 r; <br />.!"-' ""j <br /> <br />0= Project Impact Area <br /> <br />+ <br /> <br />. <br />