<br />,
<br />
<br />Willow Heights Irrigation Company, Inc.
<br />May 19-20. 2003
<br />
<br />Agenda Item 18d
<br />
<br />Water Project Construction Loan program.proJect Data
<br />
<br />.
<br />
<br />Project Name: Dual Water System
<br />
<br />County: Delta
<br />Project Type: Rehabilitation/Replacement
<br />Water Source: Leroux Creek
<br />
<br />Borrower: Willow Heights Irrigation Co.
<br />
<br />Drainage Basin: Gunnison
<br />
<br />CWCB Small Project Loan: $103,500
<br />
<br />Funding Sources: CWCB
<br />Av.er. Delivery: 257 acre-feet
<br />Interest Rate: 3.75% Term: 30 years
<br />
<br />Total Project Cost: $115,000
<br />
<br />Type of Borrower: Municipal - Low Income
<br />
<br />WHIC owns and operates an existing piped irrigation system located in the Willow Heights
<br />Subdivision and Duke Hill community in the Town of Hotchkiss. The system was constructed in
<br />1976, and water is obtained through the Duke Ditch, which diverts water from Leroux Creek. Water
<br />is supplied to about 95 residential lots and a Town park. The total irrigated area is about 60 acres,
<br />and primarily use is to irrigate lawns and gardens. The system consists of a headgate,
<br />approximately 6000 lineal feet of main distribution piping (10", 8" and 6"), and approximately 3000
<br />feet of lateral piping. Water flows by gravity and lots are served by 0/.," individual taps. The system
<br />was installed in the trench above the sanitary sewer and on the same grade. In places it Is very
<br />deep, up to 15-17 feet. The original piping was a lightweight plastic pipe, and improper backfilling
<br />resulted in crushed pipes in some areas, and significant plugging problems. As a result of the
<br />blockages, and reduced flow due to mineral deposits; the overall flow capacity is less than 1/3 of
<br />the original. The system is completeiy obstructed in ,two places, and typically only 12 to 14 users
<br />can be served at a time. The project includes installing all new distribution lines and lateral tap
<br />lines, along with cleanouts and isolation valves: The.new pipes will be installed over the top of the
<br />existing system but at a standard depth of 22 - 30". The piping will be heavier PVC, located above
<br />the existing pipe, but offset several feet to eliminate sewer manhole conflicts.
<br />
<br />=~-'"7' ..., -"'" .. 7"'-~,'''- ,
<br />~-"-'a<.:..;_/. : I' . l' a~ i
<br />~.,..... . .', I '.' _ / "," _ ___J, .Co .",
<br />- ..':fIIt........ - , ' ...... "---,{' ,~ I . '\t!.IIl'l
<br />......~. . -.;.. -, .' '~ I . / ... ~;fi " ~
<br />-?> '" : ", .- f/ \~~ i "
<br />. · ~.. . /II f.--. .'
<br />~ " ~, -~.." .
<br />. t' -""~' ~ ~
<br />ProJe~ ... ~ 1 I' 30 .. ~," Jf
<br />LocatIon ' '\"" . ..a . II ~!"
<br />. /._. , ), \'1 II II
<br />. ....-- \ \ \ \1 .
<br />'~., foJ'v :.:'\ ',' d
<br />:--., _~~ ...r,.:..;:..~"""",. .. J~
<br />t\," .,. --J
<br />,--........ ~ ---~. -
<br />...., ''\ r--
<br />~ 1~ukel
<br />.~ --~~ s::- ,I.
<br />~,..,,~,-.I
<br />, ''\~
<br />1 ..
<br />~\ ~,,/I}'~-_:::
<br />~\ Clb q
<br />I? ,.9
<br />
<br />.
<br />
<br />
<br />
<br />.
<br />
<br />Location Map
<br />
<br />Page 6 'of 6
<br />
|