Laserfiche WebLink
<br />-7- <br /> <br />plans for the use of the acquired water, subject to outlined conditions as <br />follows: 1. The requested authority to approve temporary acquisitions will <br />expire December 31, 2002; 2. All temporary acquisitions approved by the <br />Director must comply with the State Engineer's Policy regarding substitute <br />supply plans (Policy 2002-02), including provisions for State Engineer's <br />Office approval, notification and non. injury; 3. All uses of the temporarily <br />acquired water by the Board will terminate on December 31, 2002; 4. <br />Temporary acquisitions will not be considered for streams where the Board <br />does not currently hold an instream flow water right; 5. Temporary <br />acquisitions will not exceed the amount previously determined by the Board <br />to preserve the natural environment to a reasonable degree; 6. Staff will advise <br />the Board at the earliest opportunity of all temporary acquisitions approved by <br />the Director pursuant to this authority only effective due to drought conditions <br />and as drought conditions continue to exist in the year 2002. The motion was <br />seconded by Eric Wilkinson and approved 9-0. The motion was seconded by <br />David Smith and approved 9-0. <br /> <br />25. Instream Flow Decision Support System (ISFDSS) Presentation - A demonstration with <br />input <br />Tape 3 <br />Track 1, Start/Stop: 2:20:01-4:49:50 <br />Action: Information item; no formal action taken. <br /> <br />26a. Colorado River (Main stem) Basin Director's Report <br />Tape 3 <br />Track 1, Start/Stop: 4:49:50-4:52:22 <br />Action: Information item; no action taken. <br /> <br />26b. Yampa.White River Basin Director's Report <br />Tape 3 <br />Track 1, Start/Stop: 4:52:22 - 5 :00:45 <br />Action: Information item; no action taken. <br /> <br />26c. San Juan/San Miguel.Dolores River Basin Director's Report <br />Tape 3 <br />Track 1, Start/Stop: 5:00:45 - 5:05:00 <br />Action: Information item; no action taken. <br /> <br />26d. Gunnison River Basin Director's Report <br />Tape 3 <br />Track 1, Start/Stop: 5:05:00 - 5:09:00 <br />Action: Information item; no action taken. <br /> <br />27a. Denver Director's Report <br />Track 1, Start/Stop: 0000 <br />Action: No report. Denver Director absent. <br /> <br />27b. North Platte Director's Report. <br /> <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />