CF Section - CWCB Construction Fund New Loans - Colo Division of Parks and Outdoor Recreation - Jackson Lake Dam Rehabilitation
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />i 18 <br /> <br />PROJECT SUMMARY <br /> <br />Rehabilitation of Jacks~n Lake Dam <br />Jackson Lake'Reservoir and Irrigation Company <br />Colorado Division of Parks and Outdoor Recreation <br /> <br />. <br /> <br />Proiect: Rehabilitation of Jackson Lake Dam <br /> <br />,Proiect Sponsor: Jackson Lake Reservoir and Irrigation Company <br />Loan ReQuested by: Colorado bivision of Parks and Outdoor Recreation <br /> <br />Amount of Loan ReQuested: $1,100,000 from the Construction Fund <br /> <br />TVDe of Project: Agricultural and recreational, rehabilitation project for an existing dam <br /> <br />Location: About 11 miles northwest of Fort Morgan in Morgan County <br /> <br />Proiect Description: The purpose of the proposed project is to provide new slope <br />protection on the upstream face of the dam. The major project feature is new soil cement <br />facing about three to four feet thick running about 8,100 feet for 70 % of the length of the <br />dam embankment. The facing will extend from several feet below the dam embankment <br />base to about one foot below the dam crest. Existing concrete panels will be left in place <br />but the work includes investigations as to the integrity of the embankment behind the <br />existing panels. <br /> <br />. <br /> <br />Schedule: The implementation schedule calls for construction to take place from the <br />middle of August through the end of October of 2001. <br /> <br />Total Estimated Proiect Cost; $3.0 million <br /> <br />, <br />Jackson Lake Loc4tion Map <br /> <br /> <br />G lM"'i.\ <br />rw HIllS '"I <br />~~C!.!J!_ II_~ <br /> <br />.. <br /> <br />. <br /> <br />I . . <br />