Laserfiche WebLink
<br />the dam. In an effort to minimize gate operations by the Reservoir <br /> <br />) <br /> <br />Superintendent, only one gate change will be regularly scheduled each,_. <br />day. However. more frequent changes will be made if so required by <br />the State Engineer. <br /> <br />e <br /> <br />(2) Releases to the Project Canals. Releases to the project <br />irrigation canals will be adm:l.nistered and controlled by the State <br />Engineer. The Reservoir Superintendent will make no changes in the <br /> <br />releases to the canals except as ne~essary for the safe operation of <br /> <br />the project. The Reservoir superintendent's proposed change in canal <br />releases will be coordinated in advance with the State Engineer except <br />in cases where a bona fide emergency exists or is imminent. In the <br /> <br />event of failure of the irrigation supply penstock during the irri- <br /> <br />gating season, temporary emergency pumps will be provided by the <br /> <br />Govern. <br /> <br />---e <br /> <br />,) <br /> <br />ment to supply each canal during the emergency. <br /> <br />(3) The State shall repay the share of project operation and <br /> <br />maintenance costs attributable to delivery of water through the project <br /> <br />diversion structures constructed within the reservoir basin whenever <br /> <br />the reservoir storage level falls below 5426.0 feet mean sea level. <br /> <br />The share of project operation and maintenance costs due to the above- <br />cited circumstances will be determined by the District.Engineer and <br />payment from the State will be due within 60 days after presentation <br />of billing therefor. <br /> <br />(4) The State will hold and save the Government harmless from <br /> <br />all damages, claims or demands that may result from (a) .State regulation <br /> <br />-- <br /> <br />) <br /> <br />-7. <br /> <br />e <br />