Laserfiche WebLink
<br />- <br /> <br />l~; <br /> <br />.. <br /> <br />CO-MANAGEMENT OF THE WATER RIGHTS <br />FOR THE MONUMENT AND ASPINALL UNIT <br /> <br />;; <br /> <br />e <br /> <br />Priority would shift among the following: <br /> <br />· A year round minimum flow (300 cfs), <br />· A spring season (May-June) peak flow (3,500 to 12,000+ cfs) with <br />appropriate ramping rates, <br />· Shoulder flows up to 800 cfs, <br />· Flood control, <br />· Compact deliveries, <br />· Yield from Aspinall (-240,000 AFY), <br />· Reservoir storage targets (e.g. to fill Blue Mesa Reservoir, minimize <br />ice jam flooding above Blue Mesa Reservoir), <br />· Hydropower generation, <br />· Recreation in the Gunnison Gorge and at Curecanti NRA, <br />· Endangered species needs. <br /> <br />e <br /> <br />Priority would be determined based on the following <br />factors: <br /> <br />· Expected runoff volume. <br />· Pre-runoff season reservoir content. <br />· Season ofthe year. <br />· Capabilities of the physical structures. <br /> <br />e <br />