Laserfiche WebLink
<br />. <br /> <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br /> <br />. <br /> <br />. <br /> <br />3 <br /> <br />that far corner. So if the Chairman gives you a greak, that' <br /> <br /> <br />the direction to go. I hope you all have a good meeting. <br /> <br /> <br />The invitation to Fred is not only open to him but any other <br /> <br />members of the Board or staff that wishes to go up and see ou <br /> <br />Foothills project. <br />We're pouring cement, concrete, now in the dam. Big <br /> <br />project -- the tunnel, the dam, plant and so on. Any of you <br /> <br />are welcome. We have people going up there all the time. <br /> <br />We'd be delighted to have. you see it. Have a good meeting. <br />CHAIRMAN KROEGER: Thank you. There is also the <br /> <br />possibility of a tour through your computerized equipment <br /> <br />this afternoon -- your control center? <br /> <br />MR. MILLER: Yes. We have a computerized load cont 01 <br /> <br />center that's headquartered on the second floor just below <br /> <br />us. We'll be happy to take anybody through there and show <br /> <br />you how that operates. We operate all of our pumping <br /> <br />facility reservoirs and so on from that site there through <br /> <br />computer operation. <br />Or if you have time to wander through the building and <br /> <br /> <br />see the buildLng, we've been here about a year and a half <br /> <br />now. We have about 350 people in this building and our <br /> <br /> <br />entire operation is centered here now. <br /> <br /> <br />Our yards area is right behind us and that yards area <br /> <br /> <br />has been there since about 1888 and this is the first time <br /> <br /> <br />we've had all our people in the same location. So you're <br />