My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00652
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00652
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:52:53 PM
Creation date
10/4/2006 6:42:20 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/24/2001
Description
Summary Minutes and Record of Decisions - January 24-25 2001
Board Meetings - Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Miskel to state that the Attorney General's staff bring the proposed statement of <br />opposition before the Board at the March 2001 Board meeting for final approval <br />and ratification. The amended motion was approved unanimously (9-0). <br /> <br />lOa. Water Supply Planning and Finance - CWCB Construction Fund - New Loans - DNR <br />Division of Colorado Parks and Outdoor Recreation - Jackson Lake Dam Rehabilitation <br />Tape 2: Start/Stop: 3052 - 4503 <br />Action: A motion was made by Greg Walcher to accept the staff recommendation for a <br />Construction Fund loan of up to $1,7000,000 to the Colorado Division of Parks <br />and Recreation for 30 years without interest to be used for the rehabilitation of <br />Jackson Lake Dam as described in the staff memo and including the conditions <br />listed in the memo. The motion was seconded by Eric Wilkinson and approved <br />unanimously (l0-0). <br /> <br />lOb. Water Supply Planning and Finance - CWCB Construction Fund - New Loans - Tunnel <br />Water Company - Laramie/Poudre Tunnel Rehabilitation <br />Tape 2: Start/Stop: 0112 - 0356 <br />Action: A motion was made by Eric Wilkinson To accept the staff recommendation to <br />recommend a loan not to exceed $2,080,000 to the Tunnel Water Company for 30 <br />years, at the recommended blended interest rate of 4.3%, and including all of the <br />other recommendations listed in the board memo. The motion was seconded by <br />David Smith and approved unanimously (9-0). <br /> <br />lOco Water Supply Planning and Finance - CWCB Construction Fund - New Loans - Town of <br />Ouray - Skyrocket Creek Deflection Structure Project <br />Tape 2: Start/Stop: 4103 - 4300 <br />Action: A motion was made by Don Schwindt to accept the staff recommendation that the <br />Board retain the existing Town of Ouray-Skyrocket Creek Deflection Project <br />Authorization. The motion was seconded by David Smith and approved <br />unanimously (9-0). <br /> <br />lla. Water Supply Protection Planning and Finance - Severance Tax Trust Fund Perpetual Base <br />Account - New Loans - Town of Monument - Monument Dam Rehabilitation <br />Tape 2: Start/Stop: 0525 -1048 <br />Action: A motion was made by Harold Miskel to accept the staff recommendation to <br />approve a loan from the Severance Tax Trust Fund Perpetual Base Account to the <br />Town of Monument, acting through its water enterprise fund, in an amount up to <br />$2,081,000 for 30 years at an interest rate of 5.5%, to rehabilitate Monument Lake <br />Dam, and including all other recommendations made in the staff memo to the <br />Board dated January 16, 2001. The motion was seconded by Patricia Wells and <br />approved unanimously accepted. (9-0) <br /> <br />lib. Water Supply Protection Planning and Finance - Severance Tax Trust Fund Perpetual Base <br />Account - New Loans - Supply Irrigating Ditch Company - Knoth Reservoir Rehabilitation <br />Tape 2: Start/Stop: 1056 - 1083 <br /> <br />Minutes January 24-25, 2001 <br />Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.