<br />. <br /> <br />.~"if;'><Y. '>-': <br /> <br />. <br /> <br />. <br /> <br />b. The Probable Maximum Flood will be developed for the proposed dam. New HEC-I <br />models will be created. <br /> <br />c. The Corps of Engineers will prepare a report presenting the results of the hydrology study. <br />The report will contain a detailed description of the drainage area, study methods, pertinent data, risk <br />and uncertainty, and assumptions made during the course of the study. <br /> <br />2.8 SEDIMENT STUDIES. The Government will perform this item in coordination with the <br />sponsor. Sediment transport studies will be performed in accordance with Engineer Manual 1110-2- <br />4000, Sedimentation Investigations of Rivers and Reservoirs. <br /> <br />a. The Corps of Engineers will review any existing studies to determine what changes, if any, <br />are needed to meet COE criteria. <br /> <br />b. The COE will determine inflowing sediment load; trap efficiency, and maintenance <br />requirements for any proposed improvements_ <br /> <br />c. The Corps of Engineers will perform a sensitivity analysis to account for uncertainty <br />associated with sediment calculations. . .. , . <br /> <br />d. A report will be prepared to present the. results of the sediment study. The report will <br />contain a detailed description of the study methods; proposed plan, pertinent data, risk and <br />uncertainty, and assumptions made during the execution of the Study. <br /> <br />e. Quality Control. The quality control,(Qc) processes described in the QC Plan will be <br />performed for all work including an independent technical review of all products. <br /> <br />2.9 DESIGN AND COST ESTIMATES. This item will be performed by the Government. This <br />work will develop designs for alternative development and selection and the detailed design for the <br />best plan on Oak creek and Oak creek. Initial investigations reveal two possible areas requiring <br />flood control investigations which have been previously discussed. <br /> <br />a. This initial phase of the work will begin with the conception of alternatives identified for <br />possible selection of the best plan. The alternatives will be developed and designed to an extent <br />sufficient to arrive at a project cost estimate required for plan formulation and the selection <br />process. Upon completion of the selection process, the detailed designed for the best plan will be <br />initiated. The design of the best plan will be presented in an engineering appendix to the <br />feasibility study. The appendix will include a narrative of all design features and will include <br />hydrology, hydraulics, civil engineering design, cost estimating, and geotechnical data. The level <br />of detail will be in accordance with ER 1110-2-1150. The presented design for the best plan will <br />be of sufficient detail that no additional planning studies will be required and will serve as basis <br />for the next design phase. <br /> <br />SECTION B, PAGE 10 <br />