My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting 11/03/1983
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
Board Meeting 11/03/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:52:33 PM
Creation date
10/4/2006 6:41:42 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/3/1983
Description
Agenda, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />(1) Releases from and storage in Lake Powell are subject only <br />to the requirements' of section 602(a) of the 1968 CRSP <br />Act. It appears that the proposed operating plan will <br />result in greater releases from and more vacant space in <br />Lake Powell in the April-July, 1984, time frame than <br />permitted by Section 602(a) and the operating criteria <br />promulgated pursuant thereto. The Bureau justifies this <br />due to the risk, however small, of not having the <br />spillways at Glen Canyon Dam repaired in time for the <br />1984 runoff. <br /> <br />(2) The Hoover Dam flood control plan calls for a minimum of <br />5.35 maf of vacant space on January 1 of each year. Even <br />though this plan, which was completed only last year, is <br />explicitly based on the fact that the reservoir system <br />had filled and the Central Arizona Project (CAP) had yet <br />to come on line, the Bureau now appears to be arguing <br />that 7.5 maf of vacant space is needed on January I, <br />1985, because CAP is not on line and the reservoir system <br />is filled. <br /> <br />(3) As the attached memo points out, the proposed operating <br />plan would create the 7.5 maf of vacant space at the <br />expense of the Upper Basin. Furthermore, it does not <br />appear that the proposed operation of Lake Powell in 1985 <br />complies with section 602(a). <br /> <br />. <br /> <br />(4) If, on the other hand, 7.5 maf of vacant space on <br />January 1, 1985, is created by releasing substantially <br />more water from Lake Mead than the proposed operating <br />plan calls for, this would require that storage in Lakes <br />Powell and Mead be equalized on September 30, 1985 (i.e., <br />water would be released from Lake Powell) pursuant to the <br />section 602(a)(3)(ii) equalization provision. Either <br />way, then, the Bureau imposes the burden of Lower Basin <br />flood control protection on the Upper Basin even though <br />there is absolutely no legal basis for operating Upper <br />Basin reservoirs for flood control purposes. <br /> <br />Following discussion by Board members, Mr. Johnston moved, <br />seconded by Mr. Robbins, that the four issues cited above must be <br />reflected in the operating plan for water years 1984 and 1985 when <br />if approved. The motion was adopted by unanimous vote. <br /> <br />At this point in the proceedings, Mr. McDonald suggested that <br />the meeting be adjourned and reconvene at 8:30 a.m. on the <br />November 4, 1983. He recommended, further, that the Board meet in <br />executive session during the breakfast hour on November 4 to <br />discuss and take action on Agenda Item 18, Little Snake River Water <br />Management Project, Wyoming. Mr. Paddock concurred in this <br />proposed procedure. <br /> <br />. <br /> <br />-17- <br />
The URL can be used to link to this page
Your browser does not support the video tag.