Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />721 Centennial Building <br />, 313 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866.4474 <br /> <br />STATE OF COLORADO <br /> <br />- <br /> <br />MEMORANDUM <br /> <br />Roy Romer <br />Governor <br />James S. Lochhead <br />Executive Director, DNR <br />Daries C. lite, P.E. <br />Director, eWeB <br />Peter H. Evans <br />Acting Director, eweB <br /> <br />TO: Colorado Water Conservation Board Members <br /> <br />FROM: Larry Lang <br /> <br />DATE: November 23,1998 <br /> <br />SUBJECT: Agenda Items 4.1., November 23-24, 1998 Board Meeting -- <br />South Platte River Floodplain Project, Right-of-Way Actions <br /> <br />INTRODUCTION <br /> <br />At the November 6-7, 1995, Board Meeting, approval was given to grant requests for <br />easements in CWCB's Right-of-Way along the Chatfield Downstream Channel Improvement <br />Project on a case-by-case basis. The Board has received a request from the Colorado Department <br />of Transportation for a permanent easement or real estate agreement. This request is for the <br />construction of stormwater drainage systems, and a segment of roadway across the CWCB's project <br />right-of-way (ROW). <br /> <br />DISCUSSION <br /> <br />THE COLORADO DEPARTMENT OF TRANSPORTATION (CDOT) request - The CDOT <br />request (Sub acct. No. 91051) is for the construction of a segment of the new Santa Fe Drive - <br />Prince Street intersection on the CWCB Project ROW. This proposed phase of construction is <br />located downstream of the existing Prince Street interchange in the right overbank areas. The re- <br />alignment design for the frontage road for the Santa Fe Drive project will require approximately 9 <br />acres of CWCB lands. <br /> <br />The CDOT request dated September 10, 1998 and the site map are attached. <br /> <br />There is much re-construction for the Prince and Santa Fe intersection. The Board staff has visited <br />the project on a nwnber of inspections. On November 20, 1998, the Board staff reviewed the <br />CDOT request. The staff findings from the inspection are as follows: <br /> <br />. 1. The Prince Street intersection project is constructed within the CDOT right-of-way; <br />