My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00607
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00607
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:52:22 PM
Creation date
10/4/2006 6:41:22 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/22/1999
Description
Directors' Reports
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />e <br /> <br />plans and specifications. The State Engineer's office has completed their approval of the design <br />plans with construction scheduled to commence in the spring of2000 and be completed in the <br />spring of 2001. <br /> <br />San Luis Vallev Canal Companv - Diversion Structure Rehabilitation <br /> <br />Authorization: SB 97-008 County: Rio Grande - E of Monte Vista <br />Water Source: Rio Grande River Project Yield: 25,000 ac.ft. <br />Terms of Loan: $188,000@3.75% for 30 years Project Type: Diversion Structure Rehab. <br />This project is the rehabilitation of the San Luis Valley Canal Company's Rio Grande River <br />diversion structure. The project is located in Rio Grande County, 3 miles east of Monte Vista. The <br />Alamosa office of the Natural Resource Conservation Service has prepared the design plans with <br />the CWCB staff preparing the construction contract documents. Project construction has been re- <br />scheduled to commence in July 2000 and be completed in late 2000. <br /> <br />Boulder & Lefthand Irrigation Companv - Twin Lakes Outlet Improvements <br /> <br />Authorization: 1998 Small Project Loan Account County: Boulder - NE of Boulder <br />Water Source: Boulder Creek Project Yield: 218 ac.ft. <br />Terms of Loan: $50,000@3.75%for 15 years Project Type: Dam Outlet Improvements <br />This project is the reconstruction of the Boulder & Lefthand Irrigation Company reservoir's <br />(Twin Lakes) outlet and inlet structures. Recent State Engineer Office inspections indicate that the <br />outlet conduit has rusted through and is functionally obsolete. Rocky Mountain Consultants of <br />Longmont are currently preparing the improvement design with construction scheduled for the year <br />2000. <br /> <br />Loveland. City of - Green Ridge Glade Reservoir Rehabilitation <br /> <br />Authorization: HB 98-1189 County: Larimer <br />Water Source: Big Thompson River Project Yield: 6,000 acre feet <br />Terms of Loan: $2,000,000 @ 4.75% for 10 yrs. Project Type: Dam enlargement <br />This $19.2 million project is the enlargement of the Green Ridge Glade Reservoir northwest <br />of Loveland. The project consists of raising the crest of the existing dam approximately 60 feet, <br />construction of a new concrete labyrinth weir spillway, and new multi-level intake gate tower outlet <br />structure. The City has contracted with Woodward-Clyde of Denver to prepare the final design and <br />construction contract documents. Enviromnental studies are currently underway with construction <br />scheduled to commence in early 2001. <br />
The URL can be used to link to this page
Your browser does not support the video tag.