My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00597
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00597
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:52:14 PM
Creation date
10/4/2006 6:41:13 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/29/1999
Description
South Platte Conjunctive Use Project - Overview of Project Status
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-, " >,., <br /> <br />Page 8 South Park Conjunctive Use Project <br /> <br />Community <br /> <br />Continued from page 3 <br /> <br />,with the proposed changes to the alternate place of stor- <br />age, Since the Columbine Reservoir storage rights are <br />conditional and because the reservoir is still in the plan- <br />ning stage, the analysis was based on a "contemplated <br />draft" rather than an historic view analysis, As anticipated <br />in the original 96-CW -015 application, proper terms and <br />conditions need to be developed to prevent injury to other <br />water users, These terms and conditions would prevent <br />greater diversions and storage than allowed in the original <br />decree, Also, certain terms and conditions negotiated or <br />imposed as decree conditions in the South Park Conjunc- <br />tive Use Project (case 96-CW-014)" should be adopted for <br />water attributed to Columbine Reservoir Rights stored in <br />the South Park Formation, The Columbine Reservoir <br /> <br />Bulletin <br /> <br />system should also include detailed accounting of diver- <br />sions and storage (in both Columbine Reservoir and in <br />the South Park Formation) not to exceed the original de- <br />creed volumes, With these safeguards in place, the alter- <br />nate place of storage can be used without injury to other <br />vested and decreed conditional water rights.. ' <br />, <br /> <br />Copies of the reports are available at the project informa- <br />tion repositories in the Fairplay and Bailey branches of <br />the Park County Library, Questions about the reports can <br />be directed to Michael F, McHugh, Project Manager for <br />the South Park Conjunctive Use Project, He can be <br />reached at 303-739 7006 or by email at mmchugh@ci. - <br />aurora,co,us <br /> <br />The ~is a regular publication ()f the South Park Conjunctive Use Project designed to <br />keep locai'area residents and land owners fully informed about the project. To receive the Bulletin or get <br />more information about the project call (303) 739-7006, Thank you for taking the time to read this bulletin, <br /> <br />City of Aurora <br />South Park Conjunctive Use Project <br />clo Mike McHugh <br />1450 South Havana Street, #232 <br />Aurora. CO 80012 <br /> <br />Inside This Issue: <br />. SPCUP Studics <br />. Elkhol'u Thrust Fault <br />. Lcgal U pdatc <br />. U.S.G.S, Studies On-liue <br />
The URL can be used to link to this page
Your browser does not support the video tag.