My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00597
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00597
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:52:14 PM
Creation date
10/4/2006 6:41:13 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/29/1999
Description
South Platte Conjunctive Use Project - Overview of Project Status
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, ' <br /> <br />Community Bulletin Page 7 <br /> <br />Legal Update <br /> <br />Laramie-FoxHills Case Headed for Supreme Court <br /> <br />Trial Management Conference Held <br /> <br />Last spring Judge Hays ruled on motions presente~ by the <br />opposers in the Laramie-Fox Hills case (96-CW-013) that <br />the specific statutes relied upon both by the applicant and <br />the state nave no applicability out- <br />side the Denver Basin, Since the <br />proponent had relied on the appli- <br />cation of those statutes, attorneys <br />have lodged an appeal of this rul- <br />ing to the State Supreme Court, <br />and have filed an opening brief on <br />the matter. Opposers have re- <br />quested an extension until early <br />January to file their answer briefs, <br />The applicant then has a chance to <br />file a reply brief. The Supreme <br />Court will likely hear oral argu- <br />ments on the materials presented, <br />If it decides to hear onil argument, <br />both sides will appear berore the <br />Court, After the oral argument is <br />complete the justices will take the <br />matter under advisement and ren- <br />der a decision later, It could take <br />from six months to a year for the <br />court to render its decision, <br /> <br />~1 "': <br /> <br />, " <br />.:..,--:>. <br />., <br /> <br />;, ~~ <br /> <br />-1/1 <br /> <br />~~.-. <br />"';,/..'--- <br /> <br />~;'--'-~ <br />~, <br />--- .~ <br />/~ <br />..~ :<5>.z-- <br />~....s>~ <br />~?~1 <br />.-- <br /> <br />A trial management conference was held on the main <br />South Park Conjunctive Use case (96-CW-014), and <br />the Alternate Place of Storage for Columbine Reser- <br />voir Water Rights (96-CW- <br />015) in Fairplay on November <br />6, Schedules for the 96-CW- <br />014 trial were established, <br />The trial has been set for eight <br />weeks beginning on May I, <br />2000, A draft decree is due <br />out on February I, 1999, <br /> <br /> <br />\~ <br /> <br />No trial was set in the 96-CW- <br />o IS case, Another case man- <br />agement conference will be <br />~eld after completion of case <br />96-CW-014, <br /> <br />Co:>',,,,''.. <br /> <br />U.S. Geological Survey Studies to Continue, Available On-line <br /> <br />Fiscal Year 1999 began the third year that the City of Aurora has cooperated <br />with the USGS to collect baseline data regarding water resources in the Tar- <br />ryall basin, The USGS installed a stream gage on Tarryall Creek below Park <br />Gulch in spring of 1997, The gage has been collecting stream flow informa- <br />tion spring through fall. In addition to stream flow information. monthly wa- <br />ter quality samples have also been taken, The USGS also collects water level <br />information at 30-35 wells located around the project area in the South Park <br />Basin, The wells were selected to provide geographic coverage and to be rep- <br />resentative of the different aquifer systems in the Tarryall basin near the pro- <br />posed South Park Conjunctive Use Project. Results from the USGS studies <br />are posted to their web page at http://www.webserver.cr.usgs.gov/parkco <br />
The URL can be used to link to this page
Your browser does not support the video tag.