My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00564
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00564
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:51:58 PM
Creation date
10/4/2006 6:40:38 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/23/2002
Description
CF Section - Appleton (ML 369) Lateral and Drainage Corporation
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> -2- .. <br /> . <br />Proiect DescriDtion . <br />Three alternatives were analyzed in the feasibility study: <br />1. No Action <br />2. Rehabilitate the head gate structure and place the ditch in pipeline and provide a piped <br /> drainage system ($267,900) <br />3. Rehabilitate the head gate structure and the concrete ditch. <br />Alternative 3, Rehabilitate the head gate structure and the concrete ditch, would solve the seepage <br />problems, but would leave an open ditch with the associated hazards and maintenance problems. <br />For these reasons is was ruled out. Alternative 2, Rehabilitate the head gate structure and place the <br />ditch in pipeline and provide a piped drainage system, is a full rehabilitation of the lateral, resolving <br />all existing maintenance and hazard issues. This alternative is feasible and is considered the <br />preferred alternative by the members. The no-action alternative was considered unacceptable since <br />it would leave the members short of water and dealing with the high maintenance costs associated <br />with a deteriorated ditch system. <br />Selected Alternative 2 consists of construction ofa new head gate on the GVIC Main Line, and <br />placement of 16,850 feet of open ditch in pressurized plastic pipeline. The system will be <br />rehabilitated in two phases. Phase 1 will consist orthe head gate and the upper portion of the <br />lateral. Phase 2 will consist of the lower portion of the lateral. The new system will have a capacity <br />of 5 cfs, and taps will be provided for individual water users. A piped drainage system will also be <br />constructed to solve flooding problems. This alternative will solve the problems of seepage and <br />flooding, as well as provide salinity control. The pressurized taps will add value for the individual <br />water users. . <br />The implementation schedule calls for completion of financing arrangements in winter-spring 2002. <br />Final engineering design for Phase 1 will be completed in January 2002, and construction will be <br />completed by April 15, 2002. Final engineering design for Phase 2 will be completed in summer <br />2002, and construction is scheduled to be completed fall 2002. <br />Financial Analvsis <br />The total estimated cost of the project is $267,900 (including engineering costs). Funding sources <br />are shown in Table 1: <br /> Table 1: Project Funding Sources <br /> Construction 'Phase <br /> Funding Source : Grant Loan <br />NRCS Planning and Design . $19,270 <br />CWCS Loan $100,000' <br />Appleton Northwest Lateral & Drainage Co. $148,630' <br />Total ($267,900) $167,900 $100,000 <br /> Permanent Finaneing Phase <br /> NRCS Planning and Design $19,270 <br /> NRCS Construction Cost share . $161,630' <br /> CWCS Loan $87,000' . <br />Total ($267,900) $180,900 $87,000 <br /> Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br /> Water Supply Protection. Consetvation Planning <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.