My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00558
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00558
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:51:57 PM
Creation date
10/4/2006 6:40:34 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/27/1999
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br /># <br /> <br />e <br /> <br />e <br /> <br />tit <br /> <br />Proiects Under Construction <br /> <br />Lefthand Ditch Comoany - Lefthand ValIev Reservoir Rehabilitation <br /> <br />Authorization: HB 95-1155 <br />Water Source: Lefthand Creek <br />Terms of Loan: $560,000 @4.S% for 30 years <br /> <br />County: Boulder - N of Boulder <br />Project Yield: 1,624 ac.ft. <br />Project Type: Dam Rehabilitation <br /> <br />This project is the resuh of the State Engineer's order to increase the spillway capacity of the <br />Lefthand Valley Reservoir in order to comply with dam safety rules and regulations regarding <br />downstream structures. The project includes the replacement of the current spillway with a larger <br />roller compacted concrete spillway and sti11ing basin. Rocky Mountain ConsuItants of Longmont, <br />Colorado completed the permitting process, design engineering and preparation of construction <br />contract docwnents. The construction contract was awarded to Gears, mc. of Crested Butte, <br />connnenced September 1, 1998, and was completed in January 1999. Project documentation and final <br />accounting is currently underway with substantial completion scheduled in January 1999. <br /> <br />Wamslev Cattle Comoanv - Pole Mountain Dam <br /> <br />Authorization: HB 93-1273 <br />Water Source: Off-Stream Drainage <br />Terms of Loan: $45,000 @3% for 40 years <br /> <br />County: Jackson - SW of Walden <br />Project Yield: 1,905 ac.ft. <br />Project Type: Dam Rehabilitation <br /> <br />This dam rehabilitation project commenced in March 1994 by the owners of the Wamsley <br />Cattle Company. The project consists of replacing the reservoir's outlet structure and improving the <br />dam's upstream slope. The work is 99"10 complete with the final inspection by the State Engineer's <br />office comp1eted in December 1997. Project documentation and final accounting is currently underway <br />with substantial completion scheduled in February 1999. <br /> <br />Johnstown. Town of-Raw Water Pioeline <br /> <br />Authorization: SB 94-29 County: Larimer/Weld - W of Johnstown <br />Water Source: Big Thompson River Project Yield: 2,200 ac.ft. <br />Terms of Loan: $2,500,000 @4% fur 30 yearsProject Type: Pipeline Construction <br /> <br />The project includes the replacement of I 1 miles of open ditch with a 14-16 inch pipeline from <br />Lonetree Reservoir to the Town of Johnstown's water treatment plant including a booster station at the <br />reservoir and connection fucilities at the treatment plant. PRC Environmental Management, mc. of <br />Denver designed the project. The construction contract was awarded to Hall-Irwin Construction Co. <br />of Greeley and B. T. Construction, Inc. of Broomfield August 6, 1996. Construction commenced in <br />early October 1996 and was completed in June 1997. Project documentation and final accounting is <br />currently underway with substantiaI completion scheduled in February 1999. <br />
The URL can be used to link to this page
Your browser does not support the video tag.