My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00550
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00550
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:51:45 PM
Creation date
10/4/2006 6:40:16 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/29/1999
Description
WSP Section - Rio Grande Basin Issues - Rio Grande Decision Support System - Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />" <br /> <br />STATE OF COLORADO <br /> <br />. <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone: 13031866,3441 <br />FAX: 13031866,4474 <br /> <br />Bill Owens <br />Governor <br /> <br />MEMORANDUM <br /> <br />GregE. Walcher <br />Executive Director, DNR <br />Peter H. Evans <br />Director, CWeB <br /> <br />TO: Colorado Water Conservation Board Members <br /> <br />FROM: Randy Seaholm, Interstate Streams Investigations Section f(flK <br /> <br />DATE: March 24, 1999 <br /> <br />SUBJECT: Agenda Item 20c, March 29-30, 1999, Board Meeting -- <br />Rio Grande Basin Issues: <br />Rio Grande Decision Support System - Status Report <br /> <br />INTRODUCTION <br /> <br />The Board is in the first year of a three-year $4,960,000 effort to design and build the Rio Grande <br />Decision Support System. An expenditure of $2,000,000 was authOJ;ized for year 1 work. Six <br />contractors have been employed to do the development work during the year 1. <br /> <br />STATUS <br /> <br />The status of work under each of the contracts is as follows: <br /> <br />1. Groundwater (Contractor HRS Consulting) <br />HRS has selected the GMS visualization tool for use in the groundwater modeling effort. This <br />package has been tested and the summary memorandum required to document completion of <br />Task 1 submitted. Work on Task 2 has been initiated and the State's San Luis Valley <br />Groundwater Model (SL V -GWM) provided to HRS. The A WDI transcripts have been reviewed <br />and a summary memorandum of the technical issues prepared. A review of the SL W-GWM has <br />begun. Work on the Task S-Sensitivity Analysis and Task 7-Hydrogeologic Data Review and <br />Database Development has also begun. <br /> <br />2, Groundwater (uSGS Joint Funding Agreement) <br />The USGS is geophysically logging the existing confmed aquifer observation well network <br />under this agreement. Also, the USGS has been asked to look at enhancements to the <br />MODFLOW groundwater model and a preliminary Scope-of-Work for this task has been <br />provided. <br />
The URL can be used to link to this page
Your browser does not support the video tag.