My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00475
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00475
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:50:54 PM
Creation date
10/4/2006 6:39:10 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/25/2002
Description
Summary Minutes and Record of Decisions - November 25-26, 2002
Board Meetings - Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- 9- <br /> <br />Tape 3, Track 1 48:00 - end <br />Tape 4, Track 1 0 - 6:05 <br />Action: A motion was made by Greg Walcher with a second by Greg Hoskin to leave <br />the $600,000 authorization in place on the books to express to the Town of <br />Paonia that CWCB has a strong desire to help with the water supply issue <br />including authorization and possibly other funds in the future. At this time the <br />staff recommendation on the application from the Town of Paonia is denied. <br />Approved 9-0. Bob Burr was not present. The Board encouraged the Town <br />of Paonia to review it's application and return for possible consideration at a <br />future meeting. <br /> <br />21a. Water Supply Planning and Finance - En-bloc- Non-reimbursable Investment <br />Recommendations - CWCB/Division of Water Resources Satellite Monitoring System. <br />Tape 4, Track 3, 0000- <br />Action: A motion was made by Greg Hoskin with a second by Carolyn McIntosh for <br />staff recommendation that the Board request the General Assembly authorize <br />$231,000 from the Construction Fund to be appropriated to the CWCB for <br />flood forecasting and warning, instream flow monitoring, compact protection, <br />and decision support system data collection efforts; $100,000 for stream gage <br />flood hardening projects; and $303,000 from the Construction fund to be <br />appropriated to the Department of Natural Resources for allocation to the <br />Division of Water Resources to enhance, renovate, and replace the Data <br />Collection Platforms in the existing satellite monitoring system. The total cost <br />of this joint gaging effort is $634,000. Approved 8-0. Greg Walcher and Bob <br />Burr were not present. <br /> <br />21b. Water Supply Planning and Finance - En-bloc- Non-reimbursable Investment <br />Recommendations - Instream Flow Decision Support System (ISFDSS) <br />Tape 4, Track 3, cont. <br />Action: A motion was made by Greg Hoskin with a second by Carolyn McIntosh for <br />staff recommendation that the Board request the General Assembly authorize <br />$440,000 from the Construction Fund to be appropriated to implement the <br />recommended ISFDSS component of the CDSS. Approved 8-0. Greg <br />Walcher and Bob Burr were not present. <br /> <br />21c. Water Supply Planning and Finance - En-bloc- Non-reimbursable Investment <br />Recommendations - CWCB Database Pilot Progr am <br />Tape 4, Track 3, cont. <br />Action: A motion was made by Greg Hoskin with a second by Carolyn McIntosh for <br />staff recommendation that the Board request the General Assembly authorize <br />$75,000 from the Construction Fund to be appropriated to implement the <br />recommended CWCB Database Pilot Study. Approved 8-0. Greg Walcher <br />and Bob Burr were not present. <br /> <br />21d. Water Supply Planning and Finance - En-bloc- Non-reimbursable Investment <br />Recommendations - Document Imaging Program <br />Tape 4, Track 3 cont. <br /> <br />Flood Protection. Water Project Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.