Laserfiche WebLink
<br />22 <br /> <br />which are not always in areas affected by the minerals and mining industries, In addition, the CWCR needs to develop its <br />own gaging program to address program specific missions, <br /> <br />[n November 1999, the DWR requested $235,000 from the Construction Fund for the FY OO-DI Satellite . <br />Monitoring System, This request was for the seventh year of a ten.year program to replace 150 Data Collection <br />Platforms (DCPs), Each year since 1993, the construction fund paid for 15 sets of electronic equipment and provided <br />$35,000 for gaging station refurbishment, at a total cost of $120,000, The rcquested increase in 1999 resulted from an <br />expanded system that now encompasses approximately 300 DC?s at various locations throughout the state, In addition, <br />new technology, which will ultimately increase reliability and real time data transmission rates, requires the DWR to <br />upgrade its older outdated DC?s over the next 10 yeUl's, Eventually, these older DCPs wilJ not meet the requirements <br />imposed by the National Oceanic and Atmospheric Administration (NOAA) which operates the satellite used by the <br />DWR, <br /> <br />At its November 1999 Boal'd Meeting, the CWCB did not approve a $235,000 funding request by DWR and <br />instead requested the General Assembly to authorize $120,000 to be appropriated for the SatelJite Monitoring System <br />from the General Fund, This was the same funding amount that had been approved in the prcvious seven years, The <br />Board was reluctant to approve the requested increase until alternatives to providing for the increased costs could be <br />further researched, It was also suggested that this important program be funded rhrough a legislative appropriation from <br />the Long Bill. <br /> <br />In June 2000, the DWR prepared a decision item with support from the CWCB to fund the DWR Satellite <br />Monitoring System using General Funds, Unfortunately, the Department of Natural Resources was unable to givc the <br />proposed decision item a high priority and instructed the eWCB-and DWR to work cooperatively and seek funding for <br />the improvements through the annual Projects Bill, <br /> <br />Discussion <br /> <br />The CWeB's proposed Gaging Program is cUlTently under development. It is a collaborative effort between the. <br />Board's Flood Protection section, Stream and Lake protection section and Water Supply protection seclion, as well as the <br />DWR, USGS and other stakeholders, To develop the program, each section will need to address a variety of issues and <br />develop long term goals, Following is a section-by-section breakdown of issues and goals that will be addressed in the <br />development of a unified five year gaging plan: <br /> <br />Flo04 Protection Proeiam <br /> <br />. Identify gages that should be "flood hardened" so floodplain' warning systems, forecasting, and long.term hydrologic <br />records can remain in tact during high flow events, <br /> <br />· Develop construction, equipment, and operating criteria for flood hardening gages, <br /> <br />· Identify areas that would benefit from the development of new flood warning systems and coordinate with local <br />communities to develop, operate and maintain systems that will result in savings to life and property, <br /> <br />Stream and Lake Protection <br /> <br />. Develop a process to identify streams where instream flow rights are likely to be senior enough to impact <br />administration of water rights and a prioritization of those streams to determine gaging needs for efficient <br />administration, <br /> <br />. Develop construction, equipment, and operating criteria for gages related to low flow and winter measUl'ements that <br />are affected by icing conditions, . <br /> <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />