Laserfiche WebLink
<br />, <br /> <br />, <br /> <br />e <br /> <br />. <br /> <br />. <br /> <br />30a. Water Project Construction Loan Program - Status Report on the SB 96-74 <br />Investigation of Denver Basin Groundwater Management and South Platte River <br />Basin Issues. <br />Tape 6, Start/Stop: 1768 - 1887 <br />Action: Informational item; no action taken. <br /> <br />31. Next Meeting Dates. <br />Tape 6, Start/Stop: 0190 - 0426 <br />Action: Informational item; no action taken. The January Meeting will be held on <br />January 29-30 at the Northglenn Holiday Inn in conjunction with the <br />annual meeting of the Colorado Water Congress. There will be a <br />workshop on Construction Fund issues held on February 21, 1997 in <br />Denver, location to be determined at a later date. The March 1997 <br />meeting will be on March 24th and 25th in Denver. The date and location <br />of the May 1997 meeting will be set during the January 1997 meeting. <br /> <br />32. Instream Flow Monitoring - Pilot Project with Colorado Trout Unlimited. <br />Tape 6, Start/Stop: 0433 - 0925 <br />Action: A motion was made by Janice Sheftel to accept the staff recommendation <br />to participate in this issue and to write a letter of support to GOCO and <br />Trout Unlimited. The motion was seconded by David Harrison and <br />approved unanimously (7-0). <br /> <br />Adjourn 4:20 p.m. <br /> <br />a:\novrnin.96 <br />12/3/96 SCM <br /> <br />Minutes Novemher 25-26, 1996 CWCB Meeting <br />