My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00461
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00461
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2010 1:35:54 PM
Creation date
10/4/2006 6:38:29 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/7/1992
Description
Agenda or Contents, Minutes, Memos. Partial.
Board Meetings - Doc Type
Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- <br /> <br />e <br /> <br />e <br /> <br />of the environment. A quorum not present, a prelimina!)' vote was taken with the <br />intent to ratify it later. The vote was IJIlanimously (5-0) in favor of the motion with <br />, two abstentions. Vice-Chairman Martineau recessed the meeting at 10:40 am. for a <br />short break. <br /> <br />Recess (10:40 - 10:47 am.) <br /> <br />Call to Order (10:47 am.) <br /> <br />Vice-Chairman Martineau called the meeting back to order at 10:47 am. and there <br />was a quorum. Present were Harrison, Smith, Martineau, Lochhead, Sheftel, Meyring, <br />Olson, Simpson. and Duncan. Peter Evans, DNR, represented Ken Salazar. Absent <br />were Jackson. Eisel, Wright, and Norton. Norton arrived at 11:00 am. and Olson left <br />about 11:10 am. <br /> <br />6. <br /> <br />Temporal)' Storage for Parks in Chatfield Reservoir* (10:47 - 10:57 am.) <br /> <br />Randy Seaholm, CWCB staff, presented a staff memorandum and letter request from <br />the Colorado Division of Parks seeking a Board recommendation to the U.S. Army <br />Corps of Engineers that permits the Division of Parks to operate a temporary <br />substitute supply plan between Chatfield and Cherry Creek Reservoirs to assist in <br />offsetting evaporative losses at'Cherry Creek Reservoir. Mel Langdon, Parks staff, <br />spoke in favor of the request Questions were asked by Sheftel and Duncan. The <br />Board was asked to approve a staff recommendation to the Corps which allows Parks <br />to store approximately 700 acre feet in Chatfield Reservoir for release when Cherry <br />Creek is under a call from the South Platte below the Cherry Creek confluence. <br />Discussion followed by Simpson and Lochhead. A motion was made by Lochhead and <br />seconded by Sheftel to approve the staff recommendation. The motion passed by <br />unanimous (7-0) decision. <br /> <br />7. <br /> <br />Colorado River Matters (10:57 - 11:45 am.) <br /> <br />a. Negotiations among Seven Basin States <br /> <br />Jim Lochhead provided an update on discussions among the Seven Basin States' <br />representatives at a meeting held April 7-10, 1992, concerning Colorado River <br />issues. <br /> <br />b. Colorado River Operation Planning Studies <br /> <br />Jim Lochhead presented the results of a series of technical studies being conducted <br />by the Bureau of Reclamation entitled .Colorado River Operation and Planning <br />Studies (CROPS) to evaluate surplus conditions on the Colorado River. <br /> <br />May 1992 Meeting, page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.