My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00460
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00460
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:50:26 PM
Creation date
10/4/2006 6:38:29 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/13/1998
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />San Luis Valley Canal Company - Diyersion Structure Rehabilitation <br /> <br />.. <br /> <br />Authorization: SB 97-008 <br />Water Source: Rio Grande River <br />Terms ofLoan: $188,000 @ 3,75% for 30 years <br /> <br />County: Rio Grande - E of Monte Vista <br />Project Yield: 25,000 ac,ft, <br />Project Type: Diversion Structure Rehab, <br /> <br />e <br /> <br />This project is the rehabilitation of the San Luis Valley Canal Company's Rio Grande R 'T <br />diversion structure, The project is located in Rio Grande County, 3 miles east of Monte Vista, The <br />A1amosa office of the Natural Resource Conservation Service has prepared the design plans with <br />the CWCB staff preparing the construction contract docwnents, Due to unexpected expenditures in <br />1998, the Company has postponed construction of the project until the fall of 1999, <br /> <br />Minturn. Town of. Bolts Lake Dam and Ditch Rehabilitation <br /> <br />Authorization: SB 96-153 <br />Water Source: Cross Creek <br />Terms of Loan: $360,000 @ 5,25% for 30 years <br /> <br />County: Eagle - S, of Minturn <br />Project Yield: 120 ac,ft, <br />Project Type: Dam Rehabilitation <br /> <br />The Town of Minturn has employed McLaughlin Water Engineers, Ltd, of Denver to a <br />design the n~habilitation of the Bolt Lake Dam outlet works and supply ditch south of Minturn, . <br />The project has been delayed due to complications associated with acquisition of project right-of- <br />way. The project has been tentatively re.scheduled for construction in 1999, <br /> <br />e <br />
The URL can be used to link to this page
Your browser does not support the video tag.