My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00455
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00455
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:50:23 PM
Creation date
10/4/2006 6:38:21 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/7/1967
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1 <br /> <br />1 <br /> <br />HR. CRANDALL: <br /> <br />"Hr. Chairman, members of the Board, ladies <br />and gentlemen, today I wish to cover with you <br />Region 4's activities in the fields of construc- <br />tion, power operation, runoff and storage, and <br />our planning program, plus a few other inci- <br />dental items of mutual interest. with your <br />permission, I'll highlight the report which I <br />filed with the Board. <br /> <br />On the 14th of september, Morro~1 Point Dam <br />\'Iill be topped out. The final bucket of con- <br />crete will be placed in the mass of the dam. <br />Since the crest is only 12 feet in width, it <br />will not be possible to have an appropriate <br />ceremony. However, we do intend to commemorate <br />this rather significant occasion. We expect to <br />award a powerplant completion contract for <br />Morrow Point late this autumn and have the power- <br />plant in operation in 1969. <br /> <br />At Blue Mesa Dam the first unit is now <br />producing power on a trial basis and we expect <br />to have the second unit ready for testing the <br />latter part of this month and the plant com- <br />mercial not long after that. <br /> <br />On Navajo Dam, we have received a low bid <br />of a little over $600,000 for repairs to the <br />stilling basin in connection with the outlet <br />~Iorks and this work is scheduled for completion <br />early in 1968. <br /> <br />~1e modification which has been trouble- <br />some to the water users of the smith Fork <br />diversion ~Iorks "Iill be completed as a hoist <br />is delivered and hopefully that \von' t be too <br />far a\.lay. <br /> <br />At Silver Jack Dam on the Bostwick Park <br />project, the contractor is making good progress <br />on the outlet works. He "!ill finish that this <br />next spring but in the meantime he has otarted <br />placement of the embankment of the dam. I <br />can report to you that it is coming along on <br />schedule. <br />
The URL can be used to link to this page
Your browser does not support the video tag.