My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00434
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00434
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:49:59 PM
Creation date
10/4/2006 6:38:01 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/21/2002
Description
ISF Section - Proposed ISF Appropriations 2002-2003 Work Plan Priorities
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Attachment <br /> <br />. <br /> <br />Prouosed Instream Flow and Natq.ral Lake Level Date Deadlines <br /> <br />Febrnarv - Instream FlowlNatnral Lake Level Workshop - Deadline for identification of streams and lakes to be <br />included in the current work plan. <br /> <br />March - Work Plan - Proposed ISFINLL Work Plan Pr~sented to Colorado Water Conservation Board <br /> <br />Andl and Mav - Winter Data Collection - Opportunity to collect field data <br /> <br />.Inne 1- Preliminary Report Due (Prior to initial data collection) - The report shall contain the following information <br />regarding each stream segment or lake proposed: <br />I) Water Division; <br />2) Water District; <br />3) CDOW #; <br />4) Upper Terminus Description; <br />5) Lower Terminus Description; <br />6) County(ies) where stream segment is located; <br />7) USGS Quad Map(s) where segment can be found <br />8) Type of Natural Environment to be Protecte\! (I.e. fishery type); <br />9) Methodology to be used to identify flow recommendation; <br />10) Justification or Reason for Recommen<lation; <br />II) Land Status Review (percentage ofpuhlic/private land), <br />12) Existing R2CROSS and Fishery Data Collected including pictures; <br />13) Proposed work plan regarding additional field data collection; <br /> <br />.Iulv - Aueust - Summer Data Collection. Opportunity to collect field data <br /> <br />. <br /> <br />September 1- Initial Water Availability Analysis DUe - The initial water availability analysis shall contain the <br />following information: <br /> <br />1) <br />2) <br />3) <br />4) <br />5) <br />6) <br /> <br />Identification of stream basin size at upstream and downstream termini; <br />Identification of method used (Basin A.pportionment or Synthetic) <br />Identification of streamflow gages and period of record and/or basin parameters used to estimate water <br />availability; . <br />Exceedence Table and/or hydro graph <lisplaying calculated median and/or estimated mean monthly <br />flow; : <br />Identification of local precipitation sites and period of record for each; <br />Identification of existing water rights tabulation and diversion structures located within stream segment <br />, <br />proposed. <br /> <br />October 1- Instream Flow Recommendation Due -the iI\stream flow recommendation shall contain the following <br />information: . <br />I) Proposed biological instream flow recommendation; <br />2) All additional field data collected including pictures. <br /> <br />November 1- Final Water Availability Analysis COl\1plet~d <br /> <br />November 30 - Final Instream Flow Report Complete <br /> <br />. <br /> <br />Flood Protection. Water Project Planning ipld Financing. Stream and Lake Protection <br />Water Supply Protectioni. Conservation Planning <br />Page ~ of 8 <br />, <br />
The URL can be used to link to this page
Your browser does not support the video tag.